Single machine scheduling with common due data assignment in a group technology environment
From MaRDI portal
Recommendations
- Group sequencing around a common due date
- Batch scheduling and common due-date assignment on a single machine
- On optimal due date assignment without restriction and resource allocation in group technology scheduling
- Single machine scheduling problem with multiple due windows assignment in a group technology
- Optimal due date assignment and resource allocation in a group technology scheduling environment
Cites work
- A Generalized Model of Optimal Due-Date Assignment by Linear Programming
- An Algorithm for the Space-Shuttle Scheduling Problem
- An algorithm for the CON due-date determination and sequencing problem
- An alternative proof of optimality for the common due-date assignment problem
- Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem
- Due Date Assignment for Production Systems
- Minimizing Mean Squared Deviation of Completion Times About a Common Due Date
- Minimizing the average deviation of job completion times about a common due date
- Optimal Due-Date Determination and Sequencing of n Jobs on a Single Machine
- Optimal common due-date with limited completion time deviation
- Optimal due-date assignment in a job shop†
- Simulation study of job shop scheduling with due dates
- Single-machine scheduling to minimize earliness and number of tardy jobs
- Survey of scheduling research involving due date determination decisions
Cited in
(11)- A hybrid heuristic approach to minimize number of tardy jobs in group technology systems
- A survey of the state-of-the-art of common due date assignment and scheduling research
- Unbounded batch scheduling with a common due window on a single machine
- Single machine scheduling problem with multiple due windows assignment in a group technology
- A survey of scheduling problems with setup times or costs
- Optimal due date assignment and resource allocation in a group technology scheduling environment
- scientific article; zbMATH DE number 6007914 (Why is no real title available?)
- On optimal due date assignment without restriction and resource allocation in group technology scheduling
- Solving integrated process planning, dynamic scheduling, and due date assignment using metaheuristic algorithms
- Group sequencing around a common due date
- Single-machine scheduling with autonomous and induced learning to minimize total weighted number of tardy jobs
This page was built for publication: Single machine scheduling with common due data assignment in a group technology environment
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1368494)