Optimal common due-date with limited completion time deviation

From MaRDI portal





Given a set of n jobs with deterministic processing times and the same ready times, the problem is to find the optimal common flow allowance \(k^*\) for the common due-date assignment method, and the optimal job sequence \(\sigma^*\) to minimize a penalty function of missing due- dates. It is assumed that penalty will not occur if the deviation of job completion from the due-date is sufficiently small. Three lemmas are presented and a numerical example is provided to illustrate the use of the results to determine the optimal solution to the due-date determination and sequencing problem.




Cited in
(33)








This page was built for publication: Optimal common due-date with limited completion time deviation

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1097833)