Minimizing the maximum deviation of job completion time about a common due-date
From MaRDI portal
Recommendations
- A note on ``Minimizing the maximum deviation of job completion time about a common due-date
- Optimal common due-date with limited completion time deviation
- Determination of an optimal common due date and optimal sequence in a single machine job shop
- A Note on the Common Due-Date Assignment Problem
- On Optimal Common Due-Date Determination
Cites work
- scientific article; zbMATH DE number 3724172 (Why is no real title available?)
- scientific article; zbMATH DE number 2146482 (Why is no real title available?)
- A Simulation Study of Predictable Due-Dates
- Analytical determination of optimal TWK due-dates in a job shop
- Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem
- Due Date Assignment for Production Systems
- Optimal Due-Date Determination and Sequencing of n Jobs on a Single Machine
Cited in
(12)- A minimax job completion-time problem revisited
- Minimizing weighted mean absolute deviation of job completion times from their weighted mean
- A note on ``Minimizing the maximum deviation of job completion time about a common due-date
- Minmax due-date assignment on a two-machine flowshop
- A survey of the state-of-the-art of common due date assignment and scheduling research
- Minimizing mean absolute deviation of completion times about a common due date
- Minmax due-date assignment with a time window for acceptable lead-times
- Survey of scheduling research involving due date determination decisions
- Scheduling about a given common due date to minimize mean squared deviation of completion times
- A note: minmax due-date assignment problem with lead-time cost
- Two meta-heuristic algorithms for solving multi-objective flexible job-shop scheduling with parallel machine and maintenance constraints
- On the tractability of hard scheduling problems with generalized due-dates with respect to the number of different due-dates
This page was built for publication: Minimizing the maximum deviation of job completion time about a common due-date