The following pages link to Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem (Q1590044):
Displaying 50 items.
- A flow-based tabu search algorithm for the RCPSP with transfer times (Q280159) (← links)
- An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem (Q296973) (← links)
- Solving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computation (Q336432) (← links)
- Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting (Q337299) (← links)
- A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling (Q342339) (← links)
- Multiobjective project portfolio selection with fuzzy constraints (Q342776) (← links)
- Simplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithm (Q444285) (← links)
- Multimode preemptive resource investment problem subject to due dates for activities: formulation and solution procedure (Q471724) (← links)
- Multi-project scheduling with two-stage decomposition (Q490148) (← links)
- New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing (Q539456) (← links)
- A heuristic method for RCPSP with fuzzy activity times (Q621664) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- New concepts for activity float in resource-constrained project management (Q622136) (← links)
- Explaining the \texttt{cumulative} propagator (Q647477) (← links)
- A neurogenetic approach for the resource-constrained project scheduling problem (Q709106) (← links)
- Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems (Q709108) (← links)
- Efficient priority rules for the stochastic resource-constrained project scheduling problem (Q724000) (← links)
- Approximability results for the resource-constrained project scheduling problem with a single type of resources (Q744638) (← links)
- Resilience analysis for project scheduling with renewable resource constraint and uncertain activity durations (Q747041) (← links)
- When it is worthwhile to work with the stochastic RCPSP? (Q835549) (← links)
- Verifying distributed real-time properties of embedded systems via graph transformations and model checking (Q853626) (← links)
- Experimental investigation of heuristics for resource-constrained project scheduling: an update (Q858327) (← links)
- Robust optimization models for project scheduling with resource availability cost (Q880580) (← links)
- A branch and cut algorithm for resource-constrained project scheduling problem subject to nonrenewable resources with pre-scheduled procurement (Q900590) (← links)
- Strong valid inequalities for the resource-constrained scheduling problem with uniform resource requirements (Q924628) (← links)
- A random key based genetic algorithm for the resource constrained project scheduling problem (Q947946) (← links)
- A random generator of resource-constrained multi-project network problems (Q964864) (← links)
- An exact algorithm for minimizing resource availability costs in project scheduling (Q976490) (← links)
- Theoretical aspects of multicriteria flight gate scheduling: Deterministic and fuzzy models (Q983626) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- On project scheduling problem (Q1003084) (← links)
- Scheduling projects with limited number of preemptions (Q1025235) (← links)
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem (Q1037664) (← links)
- Activity list representation for a generalization of the resource-constrained project scheduling problem (Q1042097) (← links)
- Scheduling non-professional table-tennis leagues (Q1042487) (← links)
- PSPLIB -- a project scheduling problem library (Q1278481) (← links)
- Insertion techniques for static and dynamic resource-constrained project scheduling. (Q1399570) (← links)
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. (Q1399573) (← links)
- Resource-constrained project scheduling: A critical activity reordering heuristic (Q1399574) (← links)
- Solving the resource-constrained project scheduling problem by a variable neighbourhood search. (Q1427560) (← links)
- New strategies for stochastic resource-constrained project scheduling (Q1617288) (← links)
- A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs (Q1631504) (← links)
- Multi-mode resource availability cost problem with recruitment and release dates for resources (Q1634132) (← links)
- An exact composite lower bound strategy for the resource-constrained project scheduling problem (Q1652587) (← links)
- A biased random-key genetic algorithm for the project scheduling problem with flexible resources (Q1667401) (← links)
- Branch and bound algorithms for resource constrained project scheduling problem subject to nonrenewable resources with prescheduled procurement (Q1718808) (← links)
- Resource tardiness weighted cost minimization in project scheduling (Q1748510) (← links)
- Towards merging binary integer programming techniques with genetic algorithms (Q1748518) (← links)
- An effective heuristic for project scheduling with resource availability cost (Q1752859) (← links)
- A hybrid multiobjective evolutionary approach for flexible job-shop scheduling problems (Q1954823) (← links)