The following pages link to An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances (Q2256244):
Displaying 26 items.
- Personnel scheduling and supplies provisioning in emergency relief operations (Q256662) (← links)
- Scheduling resource-constrained projects with a flexible project structure (Q319777) (← links)
- An approach using SAT solvers for the RCPSP with logical constraints (Q321002) (← links)
- A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints (Q1628053) (← links)
- A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem (Q1651597) (← links)
- Resource constrained routing and scheduling: review and research prospects (Q1694813) (← links)
- Multi-attribute assignment of trains to departures in rolling stock management. Multi-attribute assignment of trains to departures in rolling stock management. A contribution to the EURO/ROADEF 2014 challenge (Q1730603) (← links)
- A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem (Q1752254) (← links)
- A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles (Q1754041) (← links)
- Mode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problem (Q1992769) (← links)
- Using schedule risk analysis with resource constraints for project control (Q2028756) (← links)
- Meta-heuristic solution with considering setup time for multi-skilled project scheduling problem (Q2120134) (← links)
- Multimode time-cost-robustness trade-off project scheduling problem under uncertainty (Q2156293) (← links)
- The multi-mode resource investment problem: a benchmark library and a computational study of lower and upper bounds (Q2215556) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- Stochastic project scheduling with hierarchical alternatives (Q2295321) (← links)
- Model and algorithm for human resource-constrained R\&D program scheduling optimization (Q2296461) (← links)
- Multimode resource-constrained project scheduling in flexible projects (Q2301187) (← links)
- Strong bounds for resource constrained project scheduling: preprocessing and cutting planes (Q2333144) (← links)
- Multi-mode resource constrained multi-project scheduling and resource portfolio problem (Q2629594) (← links)
- Impacts of synergies on software project scheduling (Q2673811) (← links)
- A modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splitting (Q2798120) (← links)
- An innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrains (Q5244304) (← links)
- Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic (Q6088236) (← links)
- A data-driven \textit{meta}-learning recommendation model for multi-mode resource constrained project scheduling problem (Q6106590) (← links)
- Continuous-time formulations for multi-mode project scheduling (Q6164343) (← links)