The following pages link to Christian Artigues (Q280174):
Displaying 50 items.
- Energetic reasoning and mixed-integer linear programming for scheduling with a continuous resource and linear efficiency functions (Q280177) (← links)
- Scheduling under a non-reversible energy source: an application of piecewise linear bounding of non-linear demand/cost functions (Q284842) (← links)
- Line search method for solving a non-preemptive strictly periodic scheduling problem (Q310329) (← links)
- Machine reassignment problem: the ROADEF/EURO challenge 2012 (Q338848) (← links)
- A note on ``Event-based MILP models for resource-constrained project scheduling problems'' (Q340321) (← links)
- Frequency assignment in a SDMA satellite communication system with beam decentring feature (Q377718) (← links)
- Fast minimum float computation in activity networks under interval uncertainty (Q398844) (← links)
- Optimization of occupancy rate in dial-a-ride problems via linear fractional column generation (Q632696) (← links)
- LSSPER: Solving the resource-constrained project scheduling problem with large neighbourhood search (Q702729) (← links)
- Event-based MILP models for resource-constrained project scheduling problems (Q709100) (← links)
- Schedule generation schemes for the jop-shop problem with sequence-dependent setup times: dominance properties and computational analysis (Q817121) (← links)
- A hybrid exact method for a scheduling problem with a continuous resource and energy constraints (Q890001) (← links)
- The car sequencing problem: overview of state-of-the-art methods and industrial case-study of the ROADEF'2005 challenge problem (Q932211) (← links)
- A branch and bound method for the job-shop problem with sequence-dependent setup times (Q940884) (← links)
- A memetic algorithm with a large neighborhood crossover operator for the generalized traveling salesman problem (Q975992) (← links)
- Parallel machine scheduling with precedence constraints and setup times (Q991370) (← links)
- Solving an integrated employee timetabling and job-shop scheduling problem via hybrid branch-and-bound (Q1010284) (← links)
- The resource-constrained activity insertion problem with minimum and maximum time lags (Q1041351) (← links)
- Flexible solutions in disjunctive scheduling: general formulation and study of the flow-shop case (Q1046704) (← links)
- Insertion techniques for static and dynamic resource-constrained project scheduling. (Q1399570) (← links)
- A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes (Q1590036) (← links)
- Column generation algorithms for bi-objective combinatorial optimization problems with a min-max objective (Q1616824) (← links)
- Integrated production and outbound distribution scheduling problems with job release dates and deadlines (Q1617275) (← links)
- Cumulative scheduling with variable task profiles and concave piecewise linear processing rate functions (Q1701239) (← links)
- Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence (Q1702665) (← links)
- On the strength of time-indexed formulations for the resource-constrained project scheduling problem (Q1728175) (← links)
- Polyhedral results and valid inequalities for the continuous energy-constrained scheduling problem (Q1732114) (← links)
- Maximization of solution flexibility for robust shop scheduling (Q1772837) (← links)
- An evolutionary and constructive approach to a crew scheduling problem in underground passenger transport (Q1959179) (← links)
- Solving the time-discrete winter runway scheduling problem: a column generation and constraint programming approach (Q2077940) (← links)
- Properties, extensions and application of piecewise linearization for Euclidean norm optimization in \(\mathbb{R}^2\) (Q2093276) (← links)
- Scheduling scientific experiments for comet exploration (Q2342608) (← links)
- Energetic reasoning for energy-constrained scheduling with a continuous resource (Q2356117) (← links)
- The resource-constrained modulo scheduling problem: an experimental study (Q2377171) (← links)
- The dynamic frequency assignment problem (Q2378376) (← links)
- Linearization of Euclidean norm dependent inequalities applied to multibeam satellites design (Q2419563) (← links)
- Vehicle routing problems with alternative paths: an application to on-demand transportation (Q2654320) (← links)
- A project scheduling problem with periodically aggregated resource-constraints (Q2669745) (← links)
- Integrated Production Scheduling and Delivery Routing: Complexity Results and Column Generation (Q2835699) (← links)
- (Q2861560) (← links)
- Lagrangian relaxation-based lower bound for resource-constrained modulo scheduling (Q2883566) (← links)
- Constraint-Propagation-Based Cutting Planes: An Application to the Resource-Constrained Project Scheduling Problem (Q2890456) (← links)
- (Q3426433) (← links)
- Models and methods for frequency assignment with cumulative interference constraints (Q3499441) (← links)
- Articles ROADEF 2007 (Q3644812) (← links)
- A Comparison of a Global Approach and a Decomposition Method for Frequency Assignment in Multibeam Satellite Systems (Q5281599) (← links)
- Column Generation for Bi-Objective Vehicle Routing Problems with a Min-Max Objective (Q5397851) (← links)
- Carpooling : the 2 Synchronization Points Shortest Paths Problem (Q5397853) (← links)
- SAT and Hybrid Models of the Car Sequencing Problem (Q5418738) (← links)
- Using column generation to compute lower bound sets for bi-objective combinatorial optimization problems (Q5501871) (← links)