The following pages link to Natashia Boland (Q291040):
Displaying 5 items.
- Scheduling arc maintenance jobs in a network to maximize total flow over time (Q406493) (← links)
- New multi-commodity flow formulations for the pooling problem (Q524906) (← links)
- LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity (Q958440) (← links)
- A strengthened formulation and cutting planes for the open pit mine production scheduling problem (Q2270449) (← links)
- Scheduling unit time arc shutdowns to maximize network flow over time: Complexity results (Q4639695) (← links)