Pages that link to "Item:Q4041331"
From MaRDI portal
The following pages link to Two machine flow shop scheduling problems with sequence dependent setup times: A dynamic programming approach (Q4041331):
Displaying 14 items.
- Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times (Q342351) (← links)
- The two-machine sequence dependent flowshop scheduling problem (Q1081528) (← links)
- A sequencing problem in the weaving industry (Q1207057) (← links)
- Heuristics for the flow line problem with setup costs (Q1303708) (← links)
- An efficient heuristic based on machine workload for the flowshop scheduling problem with setup and removal (Q1339130) (← links)
- Scheduling in a sequence dependent setup environment with genetic search (Q1342322) (← links)
- Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times. (Q1399596) (← links)
- Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics (Q1776952) (← links)
- A genetic algorithm for a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times (Q2217032) (← links)
- An iterated greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives (Q2467260) (← links)
- Flowshop scheduling research after five decades (Q2572844) (← links)
- Uma propriedade estrutural do problema de programação da produção flow shop permutacional com tempos de setup (Q3621499) (← links)
- (Q4934199) (← links)
- Flowshop-scheduling problems with makespan criterion: a review (Q5466734) (← links)