Pages that link to "Item:Q726392"
From MaRDI portal
The following pages link to Single machine batch scheduling to minimize the sum of total flow time and batch delivery cost with an unavailability interval (Q726392):
Displaying 11 items.
- Scheduling two parallel machines with machine-dependent availabilities (Q342363) (← links)
- Single machine lot scheduling to minimize the total weighted (discounted) completion time (Q1628686) (← links)
- A knowledge-based approach for multi-factory production systems (Q1652022) (← links)
- Scheduling jobs with maintenance subject to load-dependent duration on a single machine (Q1664968) (← links)
- Single-machine scheduling with workload-dependent maintenance duration to minimize maximum lateness (Q1666458) (← links)
- Scheduling and common due date assignment on a single parallel-batching machine with batch delivery (Q1723354) (← links)
- Minimizing total earliness and tardiness for common due date single-machine scheduling with an unavailability interval (Q1793403) (← links)
- Integrated production and delivery scheduling on a serial batch machine to minimize the makespan (Q2257290) (← links)
- Minimizing maximum tardiness on a single machine with family setup times and machine disruption (Q2668648) (← links)
- Single-machine batch scheduling problem with job rejection and resource dependent processing times (Q4553872) (← links)
- A fully polynomial-time approximation scheme for total completion time minimization on a single machine with DeJong's learning effect and an availability constraint (Q5059405) (← links)