The following pages link to A. M. A. Hariri (Q800821):
Displaying 15 items.
- Algorithms for two-machine flow-shop sequencing with precedence constraints (Q800822) (← links)
- A branch and bound algorithm to minimize the number of late jobs in a permutation flow-shop (Q1121779) (← links)
- An algorithm for single machine sequencing with release dates to minimize total weighted completion time (Q1171502) (← links)
- The \(M/M/c/N\) queue with balking and reneging (Q1195094) (← links)
- Branch and bound algorithms for single-machine scheduling with batch set-up times to minimize total weighted completion time (Q1273118) (← links)
- A branch and bound algorithm for the two-stage assembly scheduling problem (Q1280185) (← links)
- Scheduling a two-stage hybrid flow shop with parallel machines at the first stage (Q1357780) (← links)
- Single machine scheduling with batch set-up times to minimize maximum lateness (Q1374421) (← links)
- Single-machine scheduling to minimize maximum tardiness with minimum number of tardy jobs (Q1960313) (← links)
- Heuristics for scheduling unrelated parallel machines (Q2276868) (← links)
- (Q3916359) (← links)
- Two-machine flowshop scheduling to minimize the number of tardy jobs (Q4367035) (← links)
- Single Machine Scheduling with Deadlines to Minimize the Weighted Number of Tardy Jobs (Q4838332) (← links)
- Point Estimation and Confidence Intervals of the M/M/2/N Queue with Balking and Heterogeneity (Q4862768) (← links)
- Single Machine Scheduling to Minimize Total Weighted Late Work (Q4896450) (← links)