The following pages link to Joseph G. Szmerekovsky (Q856209):
Displaying 12 items.
- Single machine scheduling under market uncertainty (Q856210) (← links)
- Pricing and two-tier advertising with one manufacturer and one retailer (Q1011237) (← links)
- Scheduling projects with stochastic activity duration to maximize expected net present value (Q1042042) (← links)
- (Q1751728) (redirect page) (← links)
- Emergency relocation of items using single trips: special cases of the multiple knapsack assignment problem (Q1751729) (← links)
- An integer programming formulation for the project scheduling problem with irregular time-cost tradeoffs (Q1762128) (← links)
- On the complexity of project scheduling to minimize exposed time (Q2514874) (← links)
- Level workforce planning for multistage transfer lines (Q4632876) (← links)
- Technical Note—Managing a Secret Project (Q5301111) (← links)
- Factors that affect the optimal amount of central control in complex systems (Q5393030) (← links)
- Maximizing project cash availability (Q5438525) (← links)
- Project scheduling under the threat of catastrophic disruption (Q6112627) (← links)