Pages that link to "Item:Q858327"
From MaRDI portal
The following pages link to Experimental investigation of heuristics for resource-constrained project scheduling: an update (Q858327):
Displaying 50 items.
- Optimisation of gravity-fed water distribution network design: a critical review (Q257205) (← links)
- A flow-based tabu search algorithm for the RCPSP with transfer times (Q280159) (← links)
- An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem (Q296973) (← links)
- An integer programming approach to the multimode resource-constrained multiproject scheduling problem (Q310345) (← links)
- Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming (Q319710) (← links)
- An approach using SAT solvers for the RCPSP with logical constraints (Q321002) (← links)
- Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars (Q322689) (← links)
- Solving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computation (Q336432) (← links)
- Optimizing the strategic patient mix combining queueing theory and dynamic programming (Q336926) (← links)
- A Petri net-based framework for realistic project management and scheduling: an application in animation and videogames (Q342185) (← links)
- A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling (Q342339) (← links)
- Multiobjective project portfolio selection with fuzzy constraints (Q342776) (← links)
- Production scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithm (Q400054) (← links)
- Resource constraint scheduling with a fractional shared resource (Q408404) (← links)
- Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem (Q415556) (← links)
- R\&D pipeline management: task interdependencies and risk management (Q420877) (← links)
- A \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project scheduling (Q421082) (← links)
- Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers (Q421579) (← links)
- Multimode preemptive resource investment problem subject to due dates for activities: formulation and solution procedure (Q471724) (← links)
- Time symmetry of resource constrained project scheduling with general temporal constraints and take-give resources (Q513559) (← links)
- New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing (Q539456) (← links)
- A multi-start evolutionary local search for the two-dimensional loading capacitated vehicle routing problem (Q609809) (← links)
- Applying local rescheduling in response to schedule disruptions (Q613784) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- New concepts for activity float in resource-constrained project management (Q622136) (← links)
- Explaining the \texttt{cumulative} propagator (Q647477) (← links)
- Recent trends indicate rapid growth of nature-inspired optimization in academia and industry (Q652554) (← links)
- Tri-directional scheduling scheme: theory and computation (Q655202) (← links)
- An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags (Q657259) (← links)
- Event-based MILP models for resource-constrained project scheduling problems (Q709100) (← links)
- A double genetic algorithm for the MRCPSP/max (Q709102) (← links)
- A neurogenetic approach for the resource-constrained project scheduling problem (Q709106) (← links)
- Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems (Q709108) (← links)
- Efficient priority rules for the stochastic resource-constrained project scheduling problem (Q724000) (← links)
- Approximability results for the resource-constrained project scheduling problem with a single type of resources (Q744638) (← links)
- Resilience analysis for project scheduling with renewable resource constraint and uncertain activity durations (Q747041) (← links)
- Robust execution strategies for project scheduling with unreliable resources and stochastic durations (Q906557) (← links)
- Solving the resource-constrained project scheduling problem using filter-and-fan approach (Q945251) (← links)
- A random key based genetic algorithm for the resource constrained project scheduling problem (Q947946) (← links)
- Competence-driven project portfolio selection, scheduling and staff assignment (Q953307) (← links)
- NeuroGenetic approach for combinatorial optimization: an exploratory analysis (Q970182) (← links)
- Variable neighbourhood search: methods and applications (Q970194) (← links)
- Multi-objective decision analysis for competence-oriented project portfolio selection (Q976375) (← links)
- A hybrid scatter search heuristic for personalized crew rostering in the airline industry (Q976415) (← links)
- An exact algorithm for minimizing resource availability costs in project scheduling (Q976490) (← links)
- A model, heuristic procedure and decision support system for solving the movie shoot scheduling problem (Q991840) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times (Q1014947) (← links)
- Scheduling projects with limited number of preemptions (Q1025235) (← links)
- Variable neighbourhood search: Methods and applications (Q1029572) (← links)