Uncertain single-machine scheduling with deterioration and learning effect
Summary: A single-machine scheduling problem with deterioration and learning effect is studied in the present paper. The processing time and due date are considered uncertain variables due to lack of historical data. The aim is to minimize the makespan, total completion time, total weight completion time, and maximum lateness under an uncertain environment. To address the problem in an uncertain environment, the expected value model and pessimistic value model are developed. These models can be converted into equivalent models based on the inverse distribution method. It is proved that the corresponding dispatching rules can solve the problem optimally under different objective criteria. Finally, sensitivity analysis is used to illustrate the effectiveness of these rules.
- An uncertain parallel machine problem with deterioration and learning effect
- Single-machine scheduling with both deterioration and learning effects
- Some single-machine scheduling with both learning and deterioration effects
- Some single-machine scheduling problems with general effects of learning and deterioration
- Single-machine scheduling with deteriorating jobs and learning effects to minimize the makespan
- A modified uncertain entailment model
- An uncertain contract model for rural migrant worker's employment problems
- An uncertain parallel machine problem with deterioration and learning effect
- Impacts of risk attitude and outside option on compensation contracts under different information structures
- Single machine scheduling problems under the effects of nonlinear deterioration and time-dependent learning
- Single machine scheduling with a time-dependent learning effect and deteriorating jobs
- Single machine scheduling with general time-dependent deterioration, position-dependent learning and past-sequence-dependent setup times
- Single-machine due-window assignment problem with learning effect and deteriorating jobs
- Single-machine group scheduling problems with deteriorated and learning effect
- Single-machine group scheduling with general deterioration and learning effects
- Single-machine scheduling problems with the time-dependent learning effect
- Single-machine scheduling with accelerating learning effects
- Single-machine scheduling with both deterioration and learning effects
- Single-machine scheduling with deteriorating jobs and learning effects to minimize the makespan
- Single-machine scheduling with past-sequence-dependent setup times and general effects of deterioration and learning
- Some single-machine scheduling problems with general effects of learning and deterioration
- Some stability theorems of uncertain differential equation
- Stability in mean for multi-dimensional uncertain differential equation
- Stochastic scheduling problems with general position-based learning effects and stochastic breakdowns
- The pth moment exponential stability of uncertain differential equation
- Uncertain calculus with finite variation processes
- Uncertain flexible flow shop scheduling problem subject to breakdowns
- Uncertainty theory
- Value-at-risk in uncertain random risk analysis
This page was built for publication: Uncertain single-machine scheduling with deterioration and learning effect
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q780506)