Long-term resource planning in the high-tech industry: capacity or inventory? (Q2030334): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
(5 intermediate revisions by 4 users not shown)
Property / author
 
Property / author: Willem van Jaarsveld / rank
Normal rank
 
Property / author
 
Property / author: Willem van Jaarsveld / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2020.12.062 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2929179616 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Simultaneous Capacity and Production Management of Short-Life-Cycle, Produce-to-Stock Goods Under Stochastic Demand / rank
 
Normal rank
Property / cites work
 
Property / cites work: Robust capacity planning in semiconductor manufacturing / rank
 
Normal rank
Property / cites work
 
Property / cites work: Managing Capacity and Inventory Jointly in Manufacturing Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tool capacity planning in semiconductor manufacturing. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Stochastic multi-site capacity planning of TFT-LCD manufacturing using expected shadow-price based decomposition / rank
 
Normal rank
Property / cites work
 
Property / cites work: A multiobjective metaheuristic for a mean-risk multistage capacity investment problem with process flexibility / rank
 
Normal rank
Property / cites work
 
Property / cites work: A review on strategic capacity planning for the semiconductor manufacturing industry / rank
 
Normal rank
Property / cites work
 
Property / cites work: Stochastic programming based capacity planning for semiconductor wafer fab with uncertain demand and capacity / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Stability of a Capacitated, Multi-Echelon Production-Inventory System Under a Base-Stock Policy / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sensitivity Analysis for Base-Stock Levels in Multiechelon Production-Inventory Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Value of Multistage Stochastic Programming in Capacity Planning Under Uncertainty / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3410593 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A stochastic programming model for strategic capacity planning in thin film transistor-liquid crystal display (TFT-LCD) industry / rank
 
Normal rank
Property / cites work
 
Property / cites work: An enhanced L-shaped method for optimizing periodic-review inventory control problems modeled via two-stage stochastic programming / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tool capacity planning for semiconductor fabrication facilities under demand uncertainty / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sensitive terms in the path integral: Ordering and stochastic options / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Revision as of 21:41, 25 July 2024

scientific article
Language Label Description Also known as
English
Long-term resource planning in the high-tech industry: capacity or inventory?
scientific article

    Statements

    Long-term resource planning in the high-tech industry: capacity or inventory? (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    7 June 2021
    0 references
    capacity expansion
    0 references
    high-tech industry
    0 references
    multi-echelon assembly system
    0 references
    stochastic programming
    0 references
    deterministic equivalent
    0 references
    scenario-based approach
    0 references
    0 references

    Identifiers