Bi-objective multi-mode project scheduling under risk aversion
From MaRDI portal
Publication:319785
DOI10.1016/j.ejor.2015.05.004zbMath1346.90404OpenAlexW774684742MaRDI QIDQ319785
Publication date: 6 October 2016
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2015.05.004
stochastic optimizationmulti-objective optimizationproject schedulingrisk aversionstochastic dominance
Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Multi-objective and goal programming (90C29) Stochastic programming (90C15) Stochastic scheduling theory in operations research (90B36)
Related Items (5)
Multi-mode resource constrained project scheduling problem along with contractor selection ⋮ Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project ⋮ Portfolio diversification based on stochastic dominance under incomplete probability information ⋮ Resource constrained routing and scheduling: review and research prospects ⋮ Metaheuristic search techniques for multi-objective and stochastic problems: a history of the inventions of Walter J. Gutjahr in the past 22 years
Uses Software
Cites Work
- Unnamed Item
- Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers
- New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing
- Reactive scheduling in the multi-mode RCPSP
- When it is worthwhile to work with the stochastic RCPSP?
- A two-stage stochastic programming approach for project planning with uncertain activity durations
- Bi-objective resource-constrained project scheduling with robustness and makespan criteria
- Optimization with multivariate stochastic dominance constraints
- A survey of variants and extensions of the resource-constrained project scheduling problem
- PSPLIB -- a project scheduling problem library
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.
- Linear preselective policies for stochastic project scheduling
- Project scheduling under uncertainty: survey and research potentials
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Proactive policies for the stochastic resource-constrained project scheduling problem
- Portfolio construction based on stochastic dominance and target return distributions
- An efficient, adaptive parameter variation scheme for metaheuristics based on the epsilon-constraint method
- Resource allocation by means of project networks: Dominance results
- A Cutting-Surface Method for Uncertain Linear Programs with Polyhedral Stochastic Dominance Constraints
- A Stochastic Branch-and-Bound Approach to Activity Crashing in Project Management
- Preselective strategies for the optimization of stochastic project networks under resource constraints
- Simulated annealing for multi-mode resource-constrained project scheduling
- Stochastic multi-objective optimization: a survey on non-scalarizing methods
This page was built for publication: Bi-objective multi-mode project scheduling under risk aversion