Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion time

From MaRDI portal
Revision as of 04:01, 30 January 2024 by Import240129110155 (talk | contribs) (Created automatically from import240129110155)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:433105

DOI10.1016/j.ins.2011.06.010zbMath1252.90024OpenAlexW2072395188MaRDI QIDQ433105

Chou-Jung Hsu, Dar-Li Yang, Cheng, T. C. Edwin

Publication date: 13 July 2012

Published in: Information Sciences (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ins.2011.06.010




Related Items (16)

Single machine common flow allowance scheduling with deteriorating jobs and a rate-modifying activityA comparison of mixed-integer linear programming models for workforce scheduling with position-dependent processing timesParallel-machine scheduling with maintenance: praising the assignment problemParallel machine scheduling to minimize the makespan with sequence dependent deteriorating effectsOn scheduling a deteriorating rate-modifying activity to minimize the number of tardy jobsOptimization of scheduling problems with deterioration effects and an optional maintenance activityNote on ``Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion timeA maintenance activity scheduling with time-and-position dependent deteriorating effectsScheduling problems with two agents and a linear non-increasing deterioration to minimize earliness penaltiesUnrelated parallel-machine scheduling problems with multiple rate-modifying activitiesComplexity and approximation of single machine scheduling with an operator non-availability period to minimize total completion timeUnrelated parallel-machine scheduling problems with aging effects and deteriorating maintenance activitiesSet-based broadcast scheduling for minimizing the worst access time of multiple data items in wireless environmentsUnrelated Parallel-Machine Scheduling with Controllable Processing Times and Impact of Deteriorating Maintenance Activities under ConsiderationReliability analysis of random fuzzy unrepairable systemsProduction, maintenance and resource scheduling: a review



Cites Work


This page was built for publication: Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion time