Exact algorithms for a scheduling problem with unrelated parallel machines and sequence and machine-dependent setup times

From MaRDI portal
Revision as of 17:55, 30 January 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:941547

DOI10.1016/J.COR.2006.07.015zbMath1169.90010OpenAlexW2038975139MaRDI QIDQ941547

Panos M. Pardalos, Martín Gómez Ravetti, Pedro Leite Rocha, Geraldo Robson Mateus

Publication date: 1 September 2008

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.cor.2006.07.015




Related Items (25)

Simultaneous lotsizing and scheduling problems: a classification and review of modelsDesign of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraintsThe third comprehensive survey on scheduling problems with setup times/costsExact and heuristic algorithms for the parallel machine total completion time scheduling problem with dual resources, ready times, and sequence-dependent setup timesOptimizing emergency preparedness and resource utilization in mass-casualty incidentsMinimizing total tardiness and earliness on unrelated parallel machines with controllable processing timesABC-based manufacturing scheduling for unrelated parallel machines with machine-dependent and job sequence-dependent setup timesAn enhanced tabu search algorithm to minimize a bi-criteria objective in batching and scheduling problems on unrelated-parallel machines with desired lower bounds on batch sizesA comparative study of solution representations for the unrelated machines environmentOn the quadratic model for unrelated parallel machine scheduling problem with restrictive common due dateA hybrid multi-objective evolutionary algorithm approach for handling sequence- and machine-dependent set-up times in unrelated parallel machine scheduling problemAn exact branch-and-bound algorithm for \textit{seru} scheduling problem with sequence-dependent setup time and release dateMathematical model applied to single-track line scheduling problem in Brazilian railwaysUnrelated parallel-machine scheduling with deteriorating maintenance activities to minimize the total completion timeUnrelated parallel-machine scheduling with position-dependent deteriorating jobs and resource-dependent processing timeImproved combinatorial Benders decomposition for a scheduling problem with unrelated parallel machinesEnhanced salp swarm algorithm based on firefly algorithm for unrelated parallel machine scheduling with setup timesScheduling rules to minimize total tardiness in a parallel machine problem with setup and calendar constraintsAn optimal online algorithm for two-machine open shop preemptive scheduling with bounded processing timesCapacitated lot sizing and sequence dependent setup scheduling: An iterative approach for integrationDecomposition Methods for the Parallel Machine Scheduling Problem with SetupsAnalysis of variable neighborhood descent as a local search operator for total weighted tardiness problem on unrelated parallel machinesPlanning production using mathematical programming: The case of a woodturning companyA new heuristic and an exact approach for a production planning problemA non-delayed relax-and-cut algorithm for scheduling problems with parallel machines, due dates and sequence-dependent setup times


Uses Software



Cites Work




This page was built for publication: Exact algorithms for a scheduling problem with unrelated parallel machines and sequence and machine-dependent setup times