A bicriteria \(m\)-machine flowshop scheduling with sequence-dependent setup times
From MaRDI portal
Publication:967801
DOI10.1016/J.APM.2009.04.005zbMath1185.90072OpenAlexW2072453443MaRDI QIDQ967801
Publication date: 2 May 2010
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2009.04.005
sequence-dependent setup timesinteger programming modelbicriteriaheuristic methods\(m\)-machine flowshop scheduling
Related Items (5)
The third comprehensive survey on scheduling problems with setup times/costs ⋮ A high performing metaheuristic for multi-objective flowshop scheduling problem ⋮ Comments on ``A bicriteria \(m\)-machine flowshop scheduling with sequence-dependent setup times ⋮ General flowshop scheduling problem with the sequence dependent setup times: a heuristic approach ⋮ A single machine scheduling problem with availability constraints and sequence-dependent setup costs
Cites Work
- Unnamed Item
- A bicriteria parallel machine scheduling with a learning effect of setup and removal times
- A bicriteria flowshop scheduling problem with setup times
- A bicriteria flowshop scheduling with a learning effect
- A bicriteria two-machine permutation flowshop problem
- A new branch-and-bound approach for the \(n/2\)/flowshop/\(\alpha F+\beta C_{\text{max}}\) flowshop scheduling problem
- A survey of scheduling problems with setup times or costs
- A bicriteria scheduling with sequence-dependent setup times
- Two MILP models for the N × M SDST flowshop sequencing problem
- On general routing problems
- Survey of scheduling research involving setup times
- A Branch-and-Bound Approach for a Two-machine Flowshop Scheduling Problem
- A Bicriteria Scheduling Problem with a Learning Effect: Total Completion Time and Total Tardiness
This page was built for publication: A bicriteria \(m\)-machine flowshop scheduling with sequence-dependent setup times