Optimization of component reliability in the design phase of capital goods
From MaRDI portal
Publication:976367
DOI10.1016/j.ejor.2010.01.030zbMath1188.90081OpenAlexW2017199178MaRDI QIDQ976367
K. B. Öner, Geert-Jan van Houtum, Gudrun P. Kiesmüller
Publication date: 11 June 2010
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2010.01.030
Reliability, availability, maintenance, inspection in operations research (90B25) Inventory, storage, reservoirs (90B05)
Related Items (9)
On the upgrading policy after the redesign of a component for reliability improvement ⋮ Traditional or additive manufacturing? Assessing component design options through lifecycle cost analysis ⋮ A survey of maintenance and service logistics management: classification and research agenda from a maritime sector perspective ⋮ Optimal redesign decisions through failure rate estimates ⋮ Optimizing reliability and service parts logistics for a time-varying installed base ⋮ OR in spare parts management: a review ⋮ A study of repairable parts inventory system operating under performance-based contract ⋮ Maximizing system availability through joint decision on component redundancy and spares inventory ⋮ Contract design for equipment after-sales service with business interruption insurance
Cites Work
- Warranty and optimal reliability improvement through product development
- Monotonicity and supermodularity results for the Erlang loss system
- Mathematical models for analysis of warranty policies
- Product warranty management. III: A review of mathematical models
- Optimal system design considering maintenance and warranty.
- Product warranty logistics: issues and challenges.
- Cost optimization in the \((S-1,S)\) lost sales inventory model with multiple demand classes
- Performance Contracting in After-Sales Service Supply Chains
- REVIEW OF LONG-TERM WARRANTY POLICIES
- Convexity Properties of the Erlang Loss Formula
- A Queuing Model for an Inventory Problem
This page was built for publication: Optimization of component reliability in the design phase of capital goods