On the probability distribution of total quality under sublot inspection and process restoration
From MaRDI portal
Publication:1362534
DOI10.1016/S0167-6377(97)00006-0zbMath0882.90064OpenAlexW1999962853MaRDI QIDQ1362534
Publication date: 5 August 1997
Published in: Operations Research Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0167-6377(97)00006-0
Applications of statistics in engineering and industry; control charts (62P30) Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30)
Cites Work
- Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
- Lot Sizing to Reduce Capacity Utilization in a Production Process with Defective Items, Process Corrections, and Rework
- Note—The Impact of Inspection Delay on Process and Inspection Lot Sizing
- Unnamed Item
- Unnamed Item
- Unnamed Item
This page was built for publication: On the probability distribution of total quality under sublot inspection and process restoration