Note—The Impact of Inspection Delay on Process and Inspection Lot Sizing

From MaRDI portal
Publication:5752272

DOI10.1287/mnsc.36.8.999zbMath0719.90029OpenAlexW2057451826MaRDI QIDQ5752272

Evan L. Porteus

Publication date: 1990

Published in: Management Science (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/mnsc.36.8.999




Related Items (19)

A common cycle approach for solving the economic lot and inspection scheduling problemInspection scheduling for imperfect production processes under free repair warranty contractEconomic optimization of off-line inspection in a process that also produces non-conforming units when in control and conforming units when out of controlOptimizing a production system with rework and equal sized batch shipmentsProperties of the multiple lot-sizing problem with rigid demands and general yield distributionsOn the probability distribution of total quality under sublot inspection and process restorationThe value of observing the condition of a deteriorating machineThe multiple lot sizing problem of a serial production system with interrupted geometric yields, rigid demand and Pentico's heuristicIntegrated on-line and off-line quality control for products with destructive testingEconomic optimization of off-line inspection with rework considerationThe effects of inspection delay and restoration cost on the optimal inspection and production policyProperties of the multiple lot-sizing problem with rigid demand, general cost structures, and interrupted geometric yieldAn algorithm for the multiple lot sizing problem with rigid demand and interrupted geometric yieldLot streaming for quality control in two-stage batch productionFast approach to the optimal production/PM policyOptimal economic production quantity policy for randomly failing process with minimal repair, backorder and preventive maintenanceTime and inventory dependent optimal maintenance policies for single machine workstations: an MDP approachThe finite multiple lot sizing problem with interrupted geometric yield and holding costsDetermining the optimal production--maintenance policy with inspection errors: Using a Markov chain






This page was built for publication: Note—The Impact of Inspection Delay on Process and Inspection Lot Sizing