Note—The Impact of Inspection Delay on Process and Inspection Lot Sizing
From MaRDI portal
Publication:5752272
DOI10.1287/mnsc.36.8.999zbMath0719.90029OpenAlexW2057451826MaRDI QIDQ5752272
Publication date: 1990
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.36.8.999
Related Items (19)
A common cycle approach for solving the economic lot and inspection scheduling problem ⋮ Inspection scheduling for imperfect production processes under free repair warranty contract ⋮ Economic optimization of off-line inspection in a process that also produces non-conforming units when in control and conforming units when out of control ⋮ Optimizing a production system with rework and equal sized batch shipments ⋮ Properties of the multiple lot-sizing problem with rigid demands and general yield distributions ⋮ On the probability distribution of total quality under sublot inspection and process restoration ⋮ The value of observing the condition of a deteriorating machine ⋮ The multiple lot sizing problem of a serial production system with interrupted geometric yields, rigid demand and Pentico's heuristic ⋮ Integrated on-line and off-line quality control for products with destructive testing ⋮ Economic optimization of off-line inspection with rework consideration ⋮ The effects of inspection delay and restoration cost on the optimal inspection and production policy ⋮ Properties of the multiple lot-sizing problem with rigid demand, general cost structures, and interrupted geometric yield ⋮ An algorithm for the multiple lot sizing problem with rigid demand and interrupted geometric yield ⋮ Lot streaming for quality control in two-stage batch production ⋮ Fast approach to the optimal production/PM policy ⋮ Optimal economic production quantity policy for randomly failing process with minimal repair, backorder and preventive maintenance ⋮ Time and inventory dependent optimal maintenance policies for single machine workstations: an MDP approach ⋮ The finite multiple lot sizing problem with interrupted geometric yield and holding costs ⋮ Determining the optimal production--maintenance policy with inspection errors: Using a Markov chain
This page was built for publication: Note—The Impact of Inspection Delay on Process and Inspection Lot Sizing