Note—The Impact of Inspection Delay on Process and Inspection Lot Sizing
From MaRDI portal
Publication:5752272
DOI10.1287/MNSC.36.8.999zbMATH Open0719.90029OpenAlexW2057451826MaRDI QIDQ5752272FDOQ5752272
Authors: Evan L. Porteus
Publication date: 1990
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.36.8.999
Recommendations
- The effects of inspection delay and restoration cost on the optimal inspection and production policy
- scientific article; zbMATH DE number 1156571
- Impact of inspection errors on the lot size problem
- Economic optimization for an imperfect process with inspection errors, inspection time and minimal repair
- Optimal lot-sizing, quality improvement and inspection errors for multistage production systems
Cited In (19)
- Economic optimization of off-line inspection with rework consideration
- Integrated on-line and off-line quality control for products with destructive testing
- Lot streaming for quality control in two-stage batch production
- The multiple lot sizing problem of a serial production system with interrupted geometric yields, rigid demand and Pentico's heuristic
- The effects of inspection delay and restoration cost on the optimal inspection and production policy
- An algorithm for the multiple lot sizing problem with rigid demand and interrupted geometric yield
- Optimizing a production system with rework and equal sized batch shipments
- A common cycle approach for solving the economic lot and inspection scheduling problem
- Properties of the multiple lot-sizing problem with rigid demands and general yield distributions
- The finite multiple lot sizing problem with interrupted geometric yield and holding costs
- Fast approach to the optimal production/PM policy
- Properties of the multiple lot-sizing problem with rigid demand, general cost structures, and interrupted geometric yield
- On the probability distribution of total quality under sublot inspection and process restoration
- Determining the optimal production--maintenance policy with inspection errors: Using a Markov chain
- Time and inventory dependent optimal maintenance policies for single machine workstations: an MDP approach
- The value of observing the condition of a deteriorating machine
- Optimal economic production quantity policy for randomly failing process with minimal repair, backorder and preventive maintenance
- Inspection scheduling for imperfect production processes under free repair warranty contract
- Economic optimization of off-line inspection in a process that also produces non-conforming units when in control and conforming units when out of control
This page was built for publication: Note—The Impact of Inspection Delay on Process and Inspection Lot Sizing
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5752272)