Cyclic scheduling in robotic flowshops

From MaRDI portal
Revision as of 02:31, 1 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:1593526

DOI10.1023/A:1018995317468zbMath0997.90032OpenAlexW2134686833MaRDI QIDQ1593526

Vladimir Kats, Eugene Levner, Joris van de Klundert, Yves Cramer

Publication date: 17 January 2001

Published in: Annals of Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1023/a:1018995317468




Related Items (46)

Cyclic robot scheduling for 3D printer-based flexible assembly systemsA branch and bound algorithm for optimal cyclic scheduling in a robotic cell with processing time windowsBicriteria robotic cell schedulingDeclarative Modeling for Multimodal Processes Driven Distribution NetworksA note on productivity gains in flexible robotic cellsCyclic hoist scheduling in large real-life electroplating linesCyclic multiple-robot scheduling with time-window constraints using a critical path approachConverging to periodic schedules for cyclic scheduling problems with resources and deadlinesMulti-degree cyclic flow shop robotic cell scheduling problem: ant colony optimizationHybrid discrete differential evolution algorithm for biobjective cyclic hoist scheduling with reentranceA dynamic scheduling approach for optimizing the material handling operations in a robotic cellScheduling in a three-machine robotic flexible manufacturing cellScheduling in reentrant robotic cells: algorithms and complexitySequencing and scheduling in robotic cells: recent developmentsA faster algorithm for 2-cyclic robotic scheduling with a fixed robot route and interval processing timesA constraint programming model for the scheduling and workspace layout design of a dual-arm multi-tool assembly robotBi-objective speed-scaling robotic cell scheduling with peak power consumption constraintParametric algorithms for 2-cyclic robot scheduling with interval processing timesScheduling in robotic cells: process flexibility and cell layoutGenetic algorithm and its performance analysis for scheduling a single craneCyclic scheduling in robotic flowshops with bounded work-in-process levelsBicriteria robotic cell scheduling with controllable processing timesAn efficient algorithm for multi-hoist cyclic scheduling with fixed processing timesMinimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraintsPure cycles in flexible robotic cellsIdentical part production in cyclic robotic cells: Concepts, overview and open questionsAn analysis of cyclic scheduling problems in robot centered cellsA genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constraints and bounded processing timesRobotic cell scheduling with operational flexibilityTabu search algorithms for job-shop problems with a single transport robotThroughput optimization in robotic cells with input and output machine buffers: a comparative study of two key modelsMakespan minimization for flow-shop problems with transportation times and a single robotScheduling a wet station for wafer cleaning with multiple job flows and multiple wafer-handling robotsCyclic scheduling of a 2-machine robotic cell with tooling constraintsThroughput-optimal sequences for cyclically operated plantsA polynomial algorithm for 2-cyclic robotic scheduling: A non-Euclidean caseMultiple crane scheduling in a batch annealing process with no-delay constraints for machine unloadingRobotics and Control SystemsBicriteria robotic operation allocation in a flexible manufacturing cellAn optimization-based heuristic for the robotic cell problemMulti-degree cyclic scheduling of a no-wait robotic cell with multiple robotsA review of TSP based approaches for flowshop schedulingRobotic-cell scheduling: special polynomially solvable cases of the traveling salesman problem on permuted Monge matricesOn scheduling cycle shops: Classification, complexity and approximationCycles and permutations in robotic cellsScheduling dual gripper robotic cell: one-unit cycles







This page was built for publication: Cyclic scheduling in robotic flowshops