Permutation flowshop scheduling problems with maximal and minimal time lags
From MaRDI portal
Publication:2581596
DOI10.1016/J.COR.2004.11.006zbMath1091.90081OpenAlexW2077452883MaRDI QIDQ2581596
Marie-Claude Portmann, Julien Fondrevelle, Ammar Oulamara
Publication date: 10 January 2006
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2004.11.006
Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (16)
Non-permutation flowshop scheduling problem with minimal and maximal time lags: theoretical study and heuristic ⋮ Exact method for the two-machine flow-shop problem with time delays ⋮ Three-machine flow shop scheduling with overlapping waiting time constraints ⋮ The two-machine no-wait general and proportionate open shop makespan problem ⋮ Polynomial time algorithms for the UET permutation flowshop problem with time delays ⋮ Scatter search with path relinking for the job shop with time lags and setup times ⋮ Parallel partitioning method (PPM): A new exact method to solve bi-objective problems ⋮ Mixed binary integer programming formulations for the flow shop scheduling problems. A case study: ISD projects scheduling ⋮ Minimizing the number of tardy jobs in a permutation flowshop scheduling problem with setup times and time lags constraints ⋮ Modeling realistic hybrid flexible flowshop scheduling problems ⋮ Minimizing the number of late jobs for the permutation flowshop problem with secondary resources ⋮ A memetic algorithm for the job-shop with time-lags ⋮ Lexicographic optimization of a permutation flow shop scheduling problem with time lag constraints ⋮ Upper and lower bounds for the permutation flowshop scheduling problem with minimal time lags ⋮ Two-machine flowshop scheduling problem with coupled-operations ⋮ SCHEDULING TWO-MACHINE FLOW SHOPS WITH EXACT DELAYS
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Complexity results for flow-shop and open-shop scheduling problems with transportation delays
- Minimizing makespan in a two-machine flow shop with delays and unit-time operations is NP-hard
- Sequencing n Jobs on Two Machines with Arbitrary Time Lags
- Optimal two- and three-stage production schedules with setup times included
- General Flowshop Models: Job Dependent Capacities, Job Overlapping and Deterioration
- Shop Problems With Two Machines and Time Lags
- Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem
- A Heuristic Algorithm for the n Job, m Machine Sequencing Problem
This page was built for publication: Permutation flowshop scheduling problems with maximal and minimal time lags