Uncapacitated lot-sizing problem with production time windows, early productions, backlogs and lost sales
From MaRDI portal
Publication:2997889
DOI10.1080/00207543.2010.532920zbMath1211.90065OpenAlexW2074540016MaRDI QIDQ2997889
Safia Kedad-Sidhoum, Nabil Absi, Stéphane Dauzère-Pérès
Publication date: 10 May 2011
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207543.2010.532920
Related Items
Stochastic Dual Dynamic Programming for Multiechelon Lot Sizing with Component Substitution, Heuristics for the multi-item capacitated lot-sizing problem with lost sales, A hybrid Lagrangian-simulated annealing-based heuristic for the parallel-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times, Logistics for diagnostic testing: an adaptive decision-support framework, Just-in-Time Planning and Lot-Sizing, Single-item dynamic lot-sizing problems: an updated survey, Modèle linéaire mixte et heuristique pour un réseau de distribution à deux échelons pour des produits périssables, A dynamic lot sizing model with production-or-outsourcing decision under minimum production quantities, A polynomial time algorithm for the single-item lot sizing problem with capacities, minimum order quantities and dynamic time windows, MIP Formulations for a Rich Real-World Lot-Sizing Problem with Setup Carryover, Lot-sizing for production planning in a recovery system with returns, Multi-level lot sizing and job shop scheduling with compressible process times: a cutting plane approach
Cites Work
- Four equivalent lot-sizing models
- The single-item lot-sizing problem with immediate lost sales
- The multi-item capacitated lot-sizing problem with setup times and shortage costs
- Lot-sizing with production and delivery time windows
- Dynamic Version of the Economic Lot Size Model
- A Dynamic Lot-Sizing Model with Demand Time Windows
- A Forward Algorithm for the Capacitated Lot Size Model with Stockouts
- Capacitated Multi-Item Lot-Sizing Problems with Time Windows
- Dynamic lot‐sizing model with production time windows
- A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach