Publication | Date of Publication | Type |
---|
The flexible job shop scheduling problem: a review | 2024-04-16 | Paper |
Flexible job-shop scheduling with transportation resources | 2023-11-15 | Paper |
A general efficient neighborhood structure framework for the job-shop and flexible job-shop scheduling problems | 2023-09-15 | Paper |
Energy cost efficient scheduling in flexible job-shop manufacturing systems | 2023-07-11 | Paper |
Minimizing the sum of completion times on a single machine with health index and flexible maintenance operations | 2023-07-04 | Paper |
A lexicographic optimization approach for a bi-objective parallel-machine scheduling problem minimizing total quality loss and total tardiness | 2023-07-04 | Paper |
Maximizing the service level on the makespan in the stochastic flexible job-shop scheduling problem | 2023-07-03 | Paper |
An improved decision support model for scheduling production in an engineer-to-order manufacturer | 2023-06-07 | Paper |
Optimizing multiple qualifications of products on non-identical parallel machines | 2022-06-22 | Paper |
Motivations and analysis of the capacitated lot-sizing problem with setup times and minimum and maximum ending inventories | 2022-05-20 | Paper |
Dynamic lot sizing with stochastic demand timing | 2022-05-20 | Paper |
Timed route approaches for large multi-product multi-step capacitated production planning problems | 2022-03-18 | Paper |
Unrelated parallel machine scheduling with new criteria: complexity and models | 2022-03-07 | Paper |
Corrigendum to: ``Solving the flexible job shop scheduling problem with sequence-dependent setup times | 2021-11-09 | Paper |
Multiobjective optimization for complex flexible job-shop scheduling problems | 2021-11-05 | Paper |
A multi-objective optimization-simulation approach for real time rescheduling in dense railway systems | 2020-05-27 | Paper |
A queue-based aggregation approach for performance evaluation of a production system with an AMHS | 2020-01-27 | Paper |
On the importance of variability when managing metrology capacity | 2020-01-08 | Paper |
Dynamic dispatching and preventive maintenance for parallel machines with dispatching-dependent deterioration | 2019-11-11 | Paper |
An efficient Pareto approach for solving the multi-objective flexible job-shop scheduling problem with regular criteria | 2019-07-08 | Paper |
An iterated min-max procedure for practical workload balancing on non-identical parallel machines in manufacturing systems | 2019-07-05 | Paper |
Transportation mode selection in inventory models: a literature review | 2019-07-03 | Paper |
Parallel machine scheduling with time constraints on machine qualifications | 2019-04-18 | Paper |
Parallel Machine Scheduling with a Single Resource per Job | 2018-09-13 | Paper |
Heuristics based on genetic algorithms for the capacitated multi vehicle production distribution problem | 2018-07-11 | Paper |
Single-item dynamic lot-sizing problems: an updated survey | 2018-02-06 | Paper |
A batch-oblivious approach for complex job-shop scheduling problems | 2018-02-06 | Paper |
Solving the flexible job shop scheduling problem with sequence-dependent setup times | 2017-11-23 | Paper |
Just-in-Time Planning and Lot-Sizing | 2017-02-03 | Paper |
Scheduling jobs on a single batch processing machine with incompatible job families and weighted number of tardy jobs objective | 2017-01-05 | Paper |
Heuristics for the multi-item capacitated lot-sizing problem with lost sales | 2016-11-11 | Paper |
Optimized allocation of defect inspection capacity with a dynamic sampling strategy | 2016-11-10 | Paper |
The single-item green lot-sizing problem with fixed carbon emissions | 2016-10-07 | Paper |
A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem | 2016-10-06 | Paper |
A memetic algorithm to solve an unrelated parallel machine scheduling problem with auxiliary resources in semiconductor manufacturing | 2016-09-07 | Paper |
Models and Lagrangian heuristics for a two-level lot-sizing problem with bounded inventory | 2015-10-19 | Paper |
A Lagrangian heuristic for capacitated single item lot sizing problems | 2015-06-23 | Paper |
Integration of scheduling and advanced process control in semiconductor manufacturing: review and outlook | 2015-04-24 | Paper |
Scheduling job families on non-identical parallel machines with time constraints | 2014-09-26 | Paper |
Lot sizing with carbon emission constraints | 2014-07-27 | Paper |
Scheduling jobs on parallel machines to minimize a regular step total cost function | 2014-02-05 | Paper |
Erratum to: ``Scheduling jobs on parallel machines to minimize a regular step total cost function | 2014-02-05 | Paper |
An exact approach for scheduling jobs with regular step cost functions on a single machine | 2012-11-15 | Paper |
A general approach for optimizing regular criteria in the job-shop scheduling problem | 2012-05-14 | Paper |
Uncapacitated lot-sizing problem with production time windows, early productions, backlogs and lost sales | 2011-05-10 | Paper |
Polyhedral and Lagrangian approaches for lot sizing with production time windows and setup times | 2009-10-16 | Paper |
Capacitated Multi-Item Lot-Sizing Problems with Time Windows | 2009-08-13 | Paper |
A genetic local search algorithm for minimizing total weighted tardiness in the job-shop scheduling problem | 2008-02-22 | Paper |
An exact method to minimize the number of tardy jobs in single machine scheduling | 2007-12-20 | Paper |
Single-machine scheduling with time window-dependent processing times | 2006-04-11 | Paper |
Single item lot sizing problems | 2005-09-22 | Paper |
On the importance of sequencing decisions in production planning and scheduling | 2004-06-11 | Paper |
Using Lagrangean relaxation to minimize the weighted number of late jobs on a single machine | 2003-10-29 | Paper |
Genetic algorithms to minimize the weighted number of late jobs on a single machine. | 2003-10-14 | Paper |
A procedure for the one-machine sequencing problem with dependent jobs | 1999-09-15 | Paper |
Solving the discrete lotsizing and scheduling problem with sequence dependent set-up costs and set-up times using the travelling salesman problem with time windows | 1999-08-19 | Paper |
Multi-resource shop scheduling with resource flexibility | 1999-07-11 | Paper |
Minimizing late jobs in the general one machine scheduling problem | 1998-08-16 | Paper |
An integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu search | 1998-07-06 | Paper |
Routing Trains Through Railway Stations: Model Formulation and Algorithms | 1997-12-14 | Paper |
Lot Streaming in Job-Shop Scheduling | 1997-11-12 | Paper |
https://portal.mardi4nfdi.de/entity/Q4874536 | 1996-04-24 | Paper |
Integration of lotsizing and scheduling decisions in a job-shop | 1995-02-19 | Paper |
An integrated approach in production planning and scheduling | 1994-06-29 | Paper |
A modified shifting bottleneck procedure for job-shop scheduling | 1993-06-29 | Paper |