Optimal production sequencing problem to minimise line stoppage time in a mixed-model assembly line
From MaRDI portal
Publication:3019223
DOI10.1080/00207543.2010.528061zbMath1217.90111OpenAlexW2066395794MaRDI QIDQ3019223
Katsuhisa Ohno, Tej S. Dhakar, Takayoshi Tamura, Taiji Okumura
Publication date: 27 July 2011
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207543.2010.528061
Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Deterministic scheduling theory in operations research (90B35) Production models (90B30)
Cites Work
- The car sequencing problem: overview of state-of-the-art methods and industrial case-study of the ROADEF'2005 challenge problem
- Sequencing mixed-model assembly lines: survey, classification and model critique
- The product rate variation problem and its relevance in real world mixed-model assembly lines
- Heuristics and exact algorithms for solving the Monden problem
- Algorithms for real-time scheduling of jobs on mixed model assembly lines
- A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines.
- Properties of a sequencing problem for a mixed model assembly line with conveyor stoppages
- Minimizing variation of production rates in just-in-time systems: A survey
- GRASP with path relinking for a multiple objective sequencing problem for a mixed-model assembly line
- An adaptive genetic algorithm approach for the mixed-model assembly line sequencing problem
- Level scheduling of mixed-model assembly lines under storage constraints
- An analytic framework for sequencing mixed model assembly lines
- A simulation analysis for two-level sequence-scheduling for just-in-time (JIT) mixed-model assembly lines
- Sequencing mixed-model assembly lines to level parts usage and minimize line length
- Bicriteria sequencing for just-in-time mixed-model assembly lines
- Sequencing problem for a mixed-model assembly line in the Toyota production system
- Mixed-Model Sequencing to Minimize Utility Work and the Risk of Conveyor Stoppage
- Level schedules for mixed-model JIT production lines: characteristics of the largest instances that can be solved optimally
- Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems
This page was built for publication: Optimal production sequencing problem to minimise line stoppage time in a mixed-model assembly line