Economic lot scheduling problem with imperfect production processes
From MaRDI portal
Publication:3156622
DOI10.1057/PALGRAVE.JORS.2600974zbMath1055.90546OpenAlexW1972653826MaRDI QIDQ3156622
Moncer A. Hariga, Mohamed Ben-Daya
Publication date: 10 January 2005
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/palgrave.jors.2600974
Related Items (15)
A vendor-buyer inventory model for defective items with errors in inspection, stochastic lead time and freight cost ⋮ Analysis of a discrete production workstation ⋮ An optimal common production cycle time for imperfect production processes with scrap ⋮ The impact of inspection errors, imperfect maintenance and minimal repairs on an imperfect production system ⋮ Design of effective inspection schema for imperfect production systems ⋮ Imperfect reworking process consideration in integrated inventory model under permissible delay in payments ⋮ Economic lot scheduling with uncontrolled co-production ⋮ Learning curves for imperfect production processes with reworks and process restoration interruptions ⋮ Unnamed Item ⋮ Economic production quantity (EPQ) models under an imperfect production process with shortages backordered ⋮ Economic production quantity model with the effect of selling price in process unreliability system ⋮ Preservation technology investment for an inventory system with variable deterioration rate under expiration dates and price sensitive demand ⋮ Inventory and pricing decisions for an imperfect production system with quality inspection, rework, and carbon-emissions ⋮ Modelling economic order quantities, considering buy and repair options for defective items, and allowing for shortages and inspection errors ⋮ An Integrated Imperfect Production–Inventory Model with Optimal Vendor Investment and Backorder Price Discount
This page was built for publication: Economic lot scheduling problem with imperfect production processes