scientific article

From MaRDI portal
Revision as of 21:39, 4 February 2024 by Import240129110113 (talk | contribs) (Created automatically from import240129110113)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Publication:3479795

DOI<link itemprop=identifier href="https://doi.org/10.1002/1520-6750(199008)37:4<559::AID-NAV3220370409>3.0.CO;2-8" /><559::AID-NAV3220370409>3.0.CO;2-8 10.1002/1520-6750(199008)37:4<559::AID-NAV3220370409>3.0.CO;2-8zbMath0701.90049MaRDI QIDQ3479795

Asoo J. Vakharia, Yih-Long Chang

Publication date: 1990


Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.



Related Items (20)

A graph theory approach to subcontracting, machine duplication and intercell moves in cellular manufacturingSimulated annealing procedures for forming machine cells in group technologyA comprehensive review of flowshop group scheduling literatureA semi-infinite programming model for earliness/tardiness production planning with simulated annealingMetaheuristics: A bibliographyA comparative study of both standard and adaptive versions of threshold accepting and simulated annealing algorithms in three scheduling problemsCost analysis of alternative formulations for personnel scheduling in continuously operating organizationsScheduling with batching: A reviewDLSP for two-stage multi-item batch productionFlow shop scheduling to minimize the total completion time with a permanently present operator: Models and ant colony optimization metaheuristicA branch and bound enhanced genetic algorithm for scheduling a flowline manufacturing cell with sequence dependent family setup timesScheduling in cellular manufacturing systems: an heuristic approachFlowshop-scheduling problems with makespan criterion: a reviewHeuristics for permutation flow shop scheduling with batch setup timesAn improved branch and bound procedure for scheduling a flow line manufacturing cellScheduling jobs on parallel machines with sequence-dependent setup timesSimulated annealing and genetic algorithms for scheduling products with multi-level product structureScheduling a flowline manufacturing cell with sequence dependent family setup timesAn evaluation of group scheduling heuristics in a flow-line manufacturing cellA comparison of heuristic algorithms for flow shop scheduling problems with setup times and limited batch size







This page was built for publication: