scientific article
From MaRDI portal
Publication:3518847
zbMath1143.90010MaRDI QIDQ3518847
Jürgen Zimmermann, Christoph Schwindt, Francisco Ballestín
Publication date: 12 August 2008
Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.
project schedulingstochastic local searchresource levelingmake-to-order productioniterated greedy heuristic
Search theory (90B40) Deterministic scheduling theory in operations research (90B35) Production models (90B30)
Related Items (9)
A metaheuristic solution approach for the time-constrained project scheduling problem ⋮ A genetic algorithm for the robust resource leveling problem ⋮ Energy-oriented scheduling based on evolutionary algorithms ⋮ Local search methods for the flowshop scheduling problem with flowtime minimization ⋮ Resource leveling in projects with flexible structures ⋮ Resource leveling in a machine environment ⋮ Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space ⋮ Exact methods for the resource levelling problem ⋮ Optimal project duration for resource leveling
This page was built for publication: