AN EFFICIENT OPTIMAL SOLUTION OF A TWO-CRANE SCHEDULING PROBLEM
From MaRDI portal
Publication:3632031
DOI10.1142/S0217595909002146zbMath1177.90194MaRDI QIDQ3632031
Publication date: 23 June 2009
Published in: Asia-Pacific Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1142/s0217595909002146
Related Items
Cooperative twin-crane scheduling, A stochastic model for the throughput analysis of passing dual yard cranes, A generalized classification scheme for crane scheduling with interference, Storage yard operations in container terminals: literature overview, trends, and research directions, A DECISION SUPPORT SYSTEM FOR THE ALLOCATION OF YARD CRANES AND BLOCKS IN CONTAINER TERMINALS
Cites Work
- Crane scheduling in container yards with inter-crane interference
- A beam search algorithm for the load sequencing of outbound containers in port container terminals
- Deriving decision rules to locate export containers in container yards
- Crane scheduling with spatial constraints
- Performance of Bucket Brigades When Work Is Stochastic
- The Minimum Common-Cycle Algorithm for Cyclic Scheduling of Two Material Handling Hoists with Time Window Constraints
- Analysis and Algorithms for the Transtainer Routing Problem in Container Port Operations
- Interblock Crane Deployment in Container Terminals
- Heuristic algorithms for routing yard-side equipment for minimizing loading times in container terminals
- A Production Line that Balances Itself
- An Efficient Optimal Solution to the Two-Hoist No-Wait Cyclic Scheduling Problem
- A m‐parallel crane scheduling problem with a non‐crossing constraint