A Heuristic Scheduling Policy for Multi-Item, Single-Machine Production Systems with Time-Varying, Stochastic Demands
From MaRDI portal
Publication:3778529
DOI10.1287/mnsc.34.3.377zbMath0637.90052OpenAlexW4249334343MaRDI QIDQ3778529
Robert C. Leachman, André Gascon
Publication date: 1988
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.34.3.377
feedback controlmulti-item, single-machine production systemsheuristic scheduling policydynamic cycle lengths heuristicstochastic, time-varying demands
Related Items (9)
A scheduling policy for adjusting economic lot quantities to a feasible solution ⋮ A hierarchical approach for capacity coordination in multiple products single-machine production systems with stationary stochastic demands ⋮ The stochastic economic lot scheduling problem: a survey ⋮ Optimization of the stochastic dynamic production cycling problem by a genetic algorithm. ⋮ Time-varying tandem queues with blocking: modeling, analysis, and operational insights via fluid models with reflection ⋮ Flexible lot sizing in hybrid make-to-order/make-to-stock production planning ⋮ Multi-item, single-machine scheduling problem with stochastic demands: a comparison of heuristics ⋮ A note on improving the performance of the enhanced dynamic cycte lengths heuristic for the multi-item, single machine scheduling problem ⋮ Economic lot scheduling problems incorporating a cost of using the production facility
This page was built for publication: A Heuristic Scheduling Policy for Multi-Item, Single-Machine Production Systems with Time-Varying, Stochastic Demands