Pierre Lopez

From MaRDI portal
Revision as of 09:04, 7 October 2023 by Import231006081045 (talk | contribs) (Created automatically from import231006081045)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Person:280175

Available identifiers

zbMath Open lopez.pierreMaRDI QIDQ280175

List of research outcomes





PublicationDate of PublicationType
Large neighborhood search for an aeronautical assembly line time-constrained scheduling problem with multiple modes and a resource leveling objective2024-08-15Paper
Constraint programming for the robust two-machine flow-shop scheduling problem with budgeted uncertainty2023-10-04Paper
Logic-based Benders decomposition for the preemptive flexible job-shop scheduling problem2023-07-04Paper
Polyhedral results and valid inequalities for the continuous energy-constrained scheduling problem2019-03-22Paper
Cumulative scheduling with variable task profiles and concave piecewise linear processing rate functions2018-02-22Paper
A note on ``Event-based MILP models for resource-constrained project scheduling problems2016-11-14Paper
A multi-objective local search heuristic for scheduling Earth observations taken by an agile satellite2016-10-06Paper
Scheduling under a non-reversible energy source: an application of piecewise linear bounding of non-linear demand/cost functions2016-05-18Paper
Energetic reasoning and mixed-integer linear programming for scheduling with a continuous resource and linear efficiency functions2016-05-04Paper
A hybrid exact method for a scheduling problem with a continuous resource and energy constraints2015-11-09Paper
Energetic reasoning for energy-constrained scheduling with a continuous resource2015-07-28Paper
Scheduling scientific experiments for comet exploration2015-04-29Paper
https://portal.mardi4nfdi.de/entity/Q28614942013-11-08Paper
Weight-based heuristics for constraint satisfaction and combinatorial optimization problems2013-05-29Paper
A branch-and-price algorithm for the windy rural postman problem2012-04-18Paper
Climbing Depth-Bounded Adjacent Discrepancy Search for Solving Hybrid Flow Shop Scheduling Problems with Multiprocessor Tasks2011-05-26Paper
Event-based MILP models for resource-constrained project scheduling problems2010-10-15Paper
Parallel machine scheduling with precedence constraints and setup times2010-09-07Paper
Discrepancy search for the flexible job shop scheduling problem2010-09-07Paper
YIELDS: A Yet Improved Limited Discrepancy Search for CSPs2009-03-10Paper
Elementary theory and practice of sliding mode control strategies2006-05-31Paper
Schedule generation schemes for the jop-shop problem with sequence-dependent setup times: dominance properties and computational analysis2006-03-07Paper
On not-first/not-last conditions in disjunctive scheduling2000-12-19Paper
Cooperative system design in scheduling1999-06-08Paper
Robust stabilization and tracking for robotic manipulators with artificial muscles1997-11-09Paper
https://portal.mardi4nfdi.de/entity/Q43471681997-08-07Paper
An application of sliding mode control to the determination of system orders1995-01-01Paper
https://portal.mardi4nfdi.de/entity/Q52892671993-08-22Paper

Research outcomes over time

This page was built for person: Pierre Lopez