Distribution-free cumulative sum control charts using bootstrap-based control limits
From MaRDI portal
Abstract: This paper deals with phase II, univariate, statistical process control when a set of in-control data is available, and when both the in-control and out-of-control distributions of the process are unknown. Existing process control techniques typically require substantial knowledge about the in-control and out-of-control distributions of the process, which is often difficult to obtain in practice. We propose (a) using a sequence of control limits for the cumulative sum (CUSUM) control charts, where the control limits are determined by the conditional distribution of the CUSUM statistic given the last time it was zero, and (b) estimating the control limits by bootstrap. Traditionally, the CUSUM control chart uses a single control limit, which is obtained under the assumption that the in-control and out-of-control distributions of the process are Normal. When the normality assumption is not valid, which is often true in applications, the actual in-control average run length, defined to be the expected time duration before the control chart signals a process change, is quite different from the nominal in-control average run length. This limitation is mostly eliminated in the proposed procedure, which is distribution-free and robust against different choices of the in-control and out-of-control distributions.
Recommendations
Cites work
- A Nonparametric Procedure for Process Control Based on Within-Group Ranking
- A Statistical Control Chart for Stationary Process Data
- An analysis of variance test for normality (complete samples)
- Bootstrap methods: another look at the jackknife
- CONTINUOUS INSPECTION SCHEMES
- Control Charts for Dependent and Independent Measurements Based on Bootstrap Methods
- scientific article; zbMATH DE number 708500 (Why is no real title available?)
- scientific article; zbMATH DE number 1146587 (Why is no real title available?)
- scientific article; zbMATH DE number 4001209 (Why is no real title available?)
- On smoothing and the bootstrap
- Optimal stopping times for detecting changes in distributions
- Procedures for Reacting to a Change in Distribution
- Sequential analysis. Tests and confidence intervals
- Statistical fraud detection: a review
- Taguchi's Quality Engineering Handbook
- The jackknife and bootstrap
- The use of resampling for estimating control chart limits
- Weak convergence of smoothed and nonsmoothed bootstrap quantile estimates
Cited in
(36)- Using p values to design statistical process control charts
- Some robust approaches based on copula for monitoring bivariate processes and component-wise assessment
- On unified framework for continuous-time grey models: an integral matching perspective
- Control charts for dynamic process monitoring with an application to air pollution surveillance
- The use of inequalities of Camp-Meidell type in nonparametric statistical process monitoring
- Guaranteed conditional performance of control charts via bootstrap methods
- The use of resampling for estimating control chart limits
- scientific article; zbMATH DE number 6532229 (Why is no real title available?)
- A bootstrap control chart for inverse Gaussian percentiles
- Analysis of CUSUM and Other Markov-Type Control Schemes by Using Empirical Distributions
- A control chart based on weighted bootstrap with strata
- scientific article; zbMATH DE number 1916658 (Why is no real title available?)
- Monitoring change points by a sign change method
- An empirical likelihood-based CUSUM for on-line model change detection
- Parametric bootstrap process capability index control charts for both mean and dispersion
- A setwise EWMA scheme for monitoring high-dimensional datastreams
- Fast computing for dynamic screening systems when analyzing correlated data
- A distribution-free multivariate CUSUM control chart using dynamic control limits
- Large-Scale Datastreams Surveillance via Pattern-Oriented-Sampling
- Conformal Prediction: A Gentle Introduction
- Robust online detection in serially correlated directed network
- scientific article; zbMATH DE number 7765977 (Why is no real title available?)
- scientific article; zbMATH DE number 7734368 (Why is no real title available?)
- Aggregated parameter update schemes for monitoring binary profiles
- Dynamic modeling and online monitoring of tensor data streams with application to passenger flow surveillance
- A Nonparametric Adaptive Sampling Strategy for Online Monitoring of Big Data Streams
- Phase I Monitoring of Spatial Surface Data from 3D Printing
- Nonparametric Dynamic Curve Monitoring
- A data-driven approach to detecting change points in linear regression models
- Transparent Sequential Learning for Statistical Process Control of Serially Correlated Data
- Adaptive Process Monitoring Using Covariate Information
- A New Process Control Chart for Monitoring Short-Range Serially Correlated Data
- Phase II control charts for monitoring the depth-ratio of ball-bearings involving three normal variables
- Phase i distribution-free control charts for individual observations using runs and patterns
- An improved bisection-type algorithm for control chart calibration
- Estimating the limits for statistical process control charts: a direct method improving upon the bootstrap
This page was built for publication: Distribution-free cumulative sum control charts using bootstrap-based control limits
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1018623)