Middle tunnels by splitting
This paper is one of a number by the authors studying unknotting tunnels for knots. Accordingly, they do not include complete background information in this paper, but instead direct readers to earlier papers such as [Geom. Topol. 13, No. 2, 769--815 (2009; Zbl 1191.57005)]. In addition, material from [Pac. J. Math. 258, No. 1, 51--89 (2012; Zbl 1248.57005)] is used in the final section. A knot in \(S^3\) has unknotting number \(1\) if there is a single simple arc with endpoints on the knot such that the complement of a neighbourhood of the knot and the arc is a handlebody. The arc is called an unknotting tunnel for the knot. This paper is focused on knots that have a \(1\)--bridge position with respect to a standardly embedded torus. These knots always have unknotting number \(1\). Two unknotting tunnels for such a knot, called the `upper' and `lower' tunnels, can be constructed directly from the \(1\)--bridge position. An unknotting tunnel that is not the upper tunnel or the lower tunnel is called a middle tunnel. The particular knots of interest in this paper are formed from an arc lying on each of two concentric standardly embedded tori in \(S^3\) together with two arcs running between these two tori. Given such a knot \(K\) and a middle tunnel for \(K\), the authors give a construction that produces a new such knot \(K'\) and a middle tunnel for \(K'\). The authors describe this as a `splitting' or `cabling' construction. This generalises an example previously studied by \textit{H. Goda} and \textit{C. Hayashi} [Kobe J. Math. 29, 45-84 (2012)] and \textit{K. Ishihara} [Algebr. Geom. Topol. 11, No. 4, 2167--2190 (2011; Zbl 1232.57010)]. The construction may be done in four possible ways, given \(K\) and a middle tunnel, and performing different sequences usually leads to different knots. The main results of the paper give precise calculations of certain invariants of the objects in the construction, and from this they specify when certain knots can arise from the construction in different ways. This work is extended in [J. Math. Soc. Japan 65, 671--686 (2013)]. Note: in Figure 9a, the lower arc should be labelled \(\alpha(D^0)\) rather than \(\alpha(\sigma)\).
- Cabling sequences of tunnels of torus knots
- TWISTED TORUS KNOTS T(p, q; 3, s) ARE TUNNEL NUMBER ONE
- The tree of knot tunnels
- An algorithm for finding parameters of tunnels
- Iterated splitting and the classification of knot tunnels
- scientific article; zbMATH DE number 1467262
- On unknotting tunnels for knots
- There are no unexpected tunnel number one knots of genus one
- Classification of alternating knots with tunnel number one
- Non-simple links with tunnel number one
- Alternate Heegaard genus bounds distance
- An algorithm for finding parameters of tunnels
- Cabling sequences of tunnels of torus knots
- Constructing knot tunnels using giant steps
- Examples of tunnel number one knots which have the property ‘1 + 1 = 3’
- Genus two Heegaard splittings of exteriors of 1-genus 1-bridge knots. II
- Heegaard splittings of Seifert fibered spaces
- Iterated splitting and the classification of knot tunnels
- On Heegaard decompositions of torus knot exteriors and related Seifert fibre spaces
- On unknotting tunnels for knots
- Semisimple tunnels
- The tree of knot tunnels
- Tunnel leveling, depth, and bridge numbers
- UNKNOTTING TUNNELS FOR P(-2,3,7)
This page was built for publication: Middle tunnels by splitting
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1940040)