Modeling and application for rolling scheduling problem based on TSP
From MaRDI portal
Recommendations
- Production scheduling optimization algorithm for the hot rolling processes
- A mathematical model and two-stage heuristic for hot rolling scheduling in compact strip production
- Prize collecting traveling saleman problem based model and algorithm for hot strip rolling unit planning
- A multi-objective hot-rolling scheduling problem in the compact strip production
- Rolling horizon scheduling in a rolling-mill
Cites work
- scientific article; zbMATH DE number 3497315 (Why is no real title available?)
- A mathematical model and two-stage heuristic for hot rolling scheduling in compact strip production
- A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron \& Steel Complex
- Development of hybrid evolutionary algorithms for production scheduling of hot strip mill
- Modeling rolling batch planning as vehicle routing problem with time windows.
- Prize collecting traveling saleman problem based model and algorithm for hot strip rolling unit planning
- The hot strip mill production scheduling problem: A tabu search approach
Cited in
(10)- Production scheduling optimization algorithm for the hot rolling processes
- A mathematical model and two-stage heuristic for hot rolling scheduling in compact strip production
- Prize collecting traveling saleman problem based model and algorithm for hot strip rolling unit planning
- Solving the torpedo scheduling problem
- LP modelling of the finishing hot rolling programme for low carbon steel coils
- scientific article; zbMATH DE number 3891073 (Why is no real title available?)
- Modeling rolling batch planning as vehicle routing problem with time windows.
- A two-phase algorithm for rolling batch planning based on simulated annealing
- Automatic production planning of press brakes for sheet metal bending
- The hot-rolling batch scheduling method based on the prize collecting vehicle routing problem
This page was built for publication: Modeling and application for rolling scheduling problem based on TSP
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2243302)