Production scheduling optimization algorithm for the hot rolling processes
DOI10.1080/00207540600988048zbMATH Open1153.90417OpenAlexW2007525255MaRDI QIDQ3533181FDOQ3533181
Authors:
Publication date: 23 October 2008
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540600988048
Recommendations
- Development of hybrid evolutionary algorithms for production scheduling of hot strip mill
- Modeling and application for rolling scheduling problem based on TSP
- The hot-rolling batch scheduling method based on the prize collecting vehicle routing problem
- A multi-objective hot-rolling scheduling problem in the compact strip production
- A mathematical model and two-stage heuristic for hot rolling scheduling in compact strip production
simulated annealingvehicle routing problemquantum particle swarm optimizationhot rolling production scheduling
Approximation methods and heuristics in mathematical programming (90C59) Deterministic scheduling theory in operations research (90B35) Transportation, logistics and supply chain management (90B06) Production models (90B30)
Cites Work
- Optimization by simulated annealing
- A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron \& Steel Complex
- The vehicle routing problem: An overview of exact and approximate algorithms
- A review of planning and scheduling systems and methods for integrated steel production
- The hot strip mill production scheduling problem: A tabu search approach
Cited In (16)
- A multi-objective hot-rolling scheduling problem in the compact strip production
- Branch-and-price algorithm for rolling batch scheduling problem in continuous-casting and rolling processes with hybrid production mode
- A mathematical model and two-stage heuristic for hot rolling scheduling in compact strip production
- Title not available (Why is that?)
- A hybrid particle swarm optimization and tabu search algorithm for order planning problems of steel factories based on the make-to-stock and make-to-order management architecture
- Exact mathematical formulations and metaheuristic algorithms for production cost minimization: a case study of the cable industry
- Scheduling a hot rolling mill
- Modeling and application for rolling scheduling problem based on TSP
- Some comments on Chen et al. ‘Production scheduling optimization algorithm for the hot rolling processes’
- Development of hybrid evolutionary algorithms for production scheduling of hot strip mill
- QoS and energy consumption aware service composition and optimal-selection based on Pareto group leader algorithm in cloud manufacturing system
- On the integrated charge planning with flexible jobs in primary steelmaking processes
- Research on the production scheduling optimization for virtual enterprises
- Multi-objective hybrid optimization of lot scheduling for bar mill process
- A novel algorithm to scheduling optimization of melting-casting process in copper alloy strip production
- The hot-rolling batch scheduling method based on the prize collecting vehicle routing problem
This page was built for publication: Production scheduling optimization algorithm for the hot rolling processes
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3533181)