Erhan Kozan

From MaRDI portal
Person:207264

Available identifiers

zbMath Open kozan.erhanMaRDI QIDQ207264

List of research outcomes





PublicationDate of PublicationType
A real-world mine excavators timetabling methodology in open-pit mining2023-09-18Paper
A hybrid metaheuristic algorithm to optimise a real-world robotic cell2018-07-11Paper
Energy efficient scheduling of open-pit coal mine trucks2017-12-06Paper
An integrated approach for scheduling health care activities in a hospital2017-11-23Paper
Comparative analysis of three metaheuristics for short-term open pit block sequencing2017-04-28Paper
A new constraint programming approach for optimising a coal rail system2017-04-20Paper
Parallel-identical-machine job-shop scheduling with different stage-dependent buffering requirements2016-11-17Paper
Determining operations affected by delay in predictive train timetables2016-11-10Paper
Dynamic resource allocation to improve emergency department efficiency in real time2016-10-07Paper
A multi-criteria approach for hospital capacity analysis2016-10-07Paper
An integrated approach for earthwork allocation, sequencing and routing2016-06-23Paper
Parallel machine scheduling and common due window assignment with job independent earliness and tardiness costs2014-08-01Paper
Optimising a coal rail network under capacity constraints2012-01-26Paper
A job-shop scheduling approach for optimising sugarcane rail operations2012-01-26Paper
Optimised loading patterns for intermodal trains2010-09-08Paper
Techniques for restricting multiple overtaking conflicts and performing compound moves when constructing new train schedules2010-05-08Paper
A disjunctive graph model and framework for constructing new train schedules2010-03-19Paper
A sequencing approach for creating new train timetables2010-03-01Paper
Scheduling trains on parallel lines with crossover points2010-02-01Paper
Scheduling trains as a blocking parallel-machine job shop scheduling problem2009-05-19Paper
Mathematical programming models for solving two conference planning problems2009-02-03Paper
Alternative algorithms for the optimization of a simulation model of a multimodal container terminal2007-12-04Paper
Mathematical modelling of container transfers and storage locations at seaport terminals2006-10-25Paper
An assignment model for dynamic load planning of intermodal trains2005-09-28Paper
https://portal.mardi4nfdi.de/entity/Q46687722005-04-15Paper
https://portal.mardi4nfdi.de/entity/Q46687662005-04-15Paper
https://portal.mardi4nfdi.de/entity/Q46687522005-04-15Paper
https://portal.mardi4nfdi.de/entity/Q46687572005-04-15Paper
Job scheduling with technical constraints2005-04-04Paper
Sequencing and scheduling in flowshops with task redistribution2005-03-16Paper
THE ASSIGNMENT OF INDIVIDUAL RENEWABLE RESOURCES IN SCHEDULING2005-02-18Paper
An integrated material handling system for a truck assembly plant2005-01-10Paper
Ant colony optimisation for machine layout problems2004-11-22Paper
Modeling train delays in urban networks2002-04-17Paper
A meta-representation for integrating operational research and artificial intelligence in an intelligent decision support paradigm2002-01-30Paper
An approach to determine storage locations of containers at seaport terminals2001-10-10Paper
Increasing the operational efficiency of container terminals in Australia1997-11-25Paper

Research outcomes over time

This page was built for person: Erhan Kozan