Optimising a coal rail network under capacity constraints
From MaRDI portal
Publication:656055
DOI10.1007/s10696-010-9069-9zbMath1230.90035OpenAlexW2084427158MaRDI QIDQ656055
Publication date: 26 January 2012
Published in: Flexible Services and Manufacturing Journal (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10696-010-9069-9
Transportation, logistics and supply chain management (90B06) Deterministic scheduling theory in operations research (90B35)
Related Items
Emergency railway wagon scheduling by hybrid biogeography-based optimization ⋮ A hybrid metaheuristic algorithm to optimise a real-world robotic cell ⋮ Parallel-identical-machine job-shop scheduling with different stage-dependent buffering requirements ⋮ An integrated approach for scheduling health care activities in a hospital ⋮ A real-world mine excavators timetabling methodology in open-pit mining ⋮ A comparative study on three graph-based constructive algorithms for multi-stage scheduling with blocking ⋮ Network Models with Unsplittable Node Flows with Application to Unit Train Scheduling ⋮ A new constraint programming approach for optimising a coal rail system ⋮ Comparative analysis of three metaheuristics for short-term open pit block sequencing ⋮ Rail schedule optimisation in the hunter valley coal chain
Cites Work
- Unnamed Item
- Unnamed Item
- A column generation approach to train timetabling on a corridor
- Scheduling trains as a blocking parallel-machine job shop scheduling problem
- Mathematical solutions for solving periodic railway transportation
- A fast heuristic for the train scheduling problem
- Modelling the number and location of sidings on a single line railway
- An optimization based approach to the train operator scheduling problem at Singapore MRT
- A branch and bound algorithm for scheduling trains in a railway network
- A disjunctive graph model and framework for constructing new train schedules
- A fast tabu search algorithm for the group shop scheduling problem
- Bicriteria train scheduling for high-speed passenger railroad planning applications
- Heuristic techniques for single line train scheduling
- Modeling and Solving the Train Timetabling Problem
- METAHEURISTICS FOR THE MIXED SHOP SCHEDULING PROBLEM
- A Genetic Algorithm for Railway Scheduling Problems