Multistage hybrid flowshop scheduling with identical jobs and uniform parallel machines
From MaRDI portal
Publication:1295836
DOI10.1002/(SICI)1099-1425(199905/06)2:3%3C135::AID-JOS21%3E3.0.CO;2-LzbMATH Open0963.90030MaRDI QIDQ1295836FDOQ1295836
Authors: Sushil Verma, Maged Dessouky
Publication date: 9 July 2001
Published in: Journal of Scheduling (Search for Journal in Brave)
Recommendations
- Flowshop scheduling with identical jobs and uniform parallel machines
- Flexible flow shop scheduling with uniform parallel machines
- Two-Stage, Hybrid Flowshop Scheduling Problem
- Two-stage flowshop scheduling problems with identical and batch processors
- Geometrical heuristics for multiprocessor flowshop scheduling with uniform machines at each stage
Cites Work
- Title not available (Why is that?)
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- A state-of-the-art review of parallel-machine scheduling research
- Two-Stage, Hybrid Flowshop Scheduling Problem
- Scheduling identical jobs on uniform parallel machines
- Scheduling a two-stage hybrid flowshop with separable setup and removal times
- Minimizing makespan in hybrid flowshops
- Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time
- Flowshop scheduling with identical jobs and uniform parallel machines
Cited In (6)
- A taxonomy of flexible flow line scheduling procedures
- The hybrid flow shop scheduling problem
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
- Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
- Flexible flow shop scheduling with uniform parallel machines
- Title not available (Why is that?)
This page was built for publication: Multistage hybrid flowshop scheduling with identical jobs and uniform parallel machines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1295836)