Multistage hybrid flowshop scheduling with identical jobs and uniform parallel machines
From MaRDI portal
(Redirected from Publication:1295836)
Recommendations
- Flowshop scheduling with identical jobs and uniform parallel machines
- Flexible flow shop scheduling with uniform parallel machines
- Two-Stage, Hybrid Flowshop Scheduling Problem
- Two-stage flowshop scheduling problems with identical and batch processors
- Geometrical heuristics for multiprocessor flowshop scheduling with uniform machines at each stage
Cites work
- scientific article; zbMATH DE number 193411 (Why is no real title available?)
- A state-of-the-art review of parallel-machine scheduling research
- Flowshop scheduling with identical jobs and uniform parallel machines
- Minimizing makespan in hybrid flowshops
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Scheduling a two-stage hybrid flowshop with separable setup and removal times
- Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time
- Scheduling identical jobs on uniform parallel machines
- Two-Stage, Hybrid Flowshop Scheduling Problem
Cited in
(6)- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
- Flexible flow shop scheduling with uniform parallel machines
- The hybrid flow shop scheduling problem
- Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
- scientific article; zbMATH DE number 4152123 (Why is no real title available?)
- A taxonomy of flexible flow line scheduling procedures
This page was built for publication: Multistage hybrid flowshop scheduling with identical jobs and uniform parallel machines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1295836)