Constraint programming models for integrated container terminal operations
From MaRDI portal
Publication:2189889
Recommendations
- Constraint and mathematical programming models for integrated port container terminal operations
- Combining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vessel
- Scheduling quay cranes and yard trucks for unloading operations in container ports
- Integrated scheduling of crane handling and truck transportation in a maritime container terminal
- Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals
Cites work
- A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal
- A fast heuristic for quay crane scheduling with interference constraints
- A follow-up survey of berth allocation and quay crane scheduling problems in container terminals
- A genetic algorithm for optimization of integrated scheduling of cranes, vehicles, and storage platforms at automated container terminals
- A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal
- A tabu search heuristic for the quay crane scheduling problem
- Constraint and mathematical programming models for integrated port container terminal operations
- Integrated scheduling of crane handling and truck transportation in a maritime container terminal
- Integrated scheduling of handling equipment at automated container terminals
- Modeling and solution of the joint quay crane and truck scheduling problem
- Multi objective optimization of coordinated scheduling of cranes and vehicles at container terminals
Cited in
(12)- An efficient and fast local search based heuristic for reel management in a production line of oil extraction pipes
- Container port truck dispatching optimization using Real2Sim based deep reinforcement learning
- Scheduling ASC and AGV considering direct, buffer, and hybrid modes for transferring containers
- Integrated scheduling of crane handling and truck transportation in a maritime container terminal
- The synergistic effect of operational research and big data analytics in greening container terminal operations: a review and future directions
- Unmanned surface vehicles (USVs) scheduling method by a bi-level mission planning and path control
- Constraint programming model for multi-manned assembly line balancing problem
- Scheduling in manufacturing with transportation: classification and solution techniques
- Constraint and mathematical programming models for integrated port container terminal operations
- Distributionally Robust Joint Chance Constrained Vessel Fleet Deployment Problem
- A constraint programming approach for the premarshalling problem
- Combining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vessel
This page was built for publication: Constraint programming models for integrated container terminal operations
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2189889)