A quantitative approach for the long-term assessment of railway rapid transit network construction or expansion projects
From MaRDI portal
Publication:2239999
Recommendations
- Solving real-size stochastic railway rapid transit network construction scheduling problems
- Integrated approach to network design and frequency setting problem in railway rapid transit systems
- Urban rapid transit network capacity expansion
- An adaptive neighborhood search metaheuristic for the integrated railway rapid transit network design and line planning problem
- scientific article; zbMATH DE number 1683935
Cites work
- A coverage model for improving public transit system accessibility and expanding access
- A general rapid network design, line planning and fleet investment integrated model
- A multi-modal approach to the location of a rapid transit line
- An adaptive neighborhood search metaheuristic for the integrated railway rapid transit network design and line planning problem
- An effective branch-and-price algorithm for the preemptive resource constrained project scheduling problem based on minimal interval order enumeration
- Capital- and resource-constrained project scheduling with net present value optimization
- Fare optimality analysis of urban rail transit under various objective functions
- Heuristics for multi-period capacity expansion in local telecommunications networks
- Incremental network design with maximum flows
- Incremental network design with shortest paths
- Integration of electromagnetism with multi-objective evolutionary algorithms for RCPSP
- Integration of selecting and scheduling urban road construction projects as a time-dependent discrete network design problem
- Line planning with minimal traveling time
- Locating a transit line using tabu search
- Minimizing total weighted late work in the resource-constrained project scheduling problem
- Models for fare planning in public transport
- Multi-period capacity expansion for a local access telecommunications network
- Multiobjective model for solving resource-leveling problem with discounted cash flows
- Rapid transit network design for optimal cost and origin-destination demand capture
- Resource levelling in project scheduling with generalized precedence relationships and variable execution intensities
Cited in
(2)
This page was built for publication: A quantitative approach for the long-term assessment of railway rapid transit network construction or expansion projects
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2239999)