Minimizing makespan in three-machine flow shops with deteriorating jobs

From MaRDI portal
Publication:340257

DOI10.1016/j.cor.2012.08.006zbMath1349.90410OpenAlexW2083198448MaRDI QIDQ340257

Ming-Zheng Wang, Ji-Bo Wang

Publication date: 14 November 2016

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.cor.2012.08.006



Related Items

Due-window assignment scheduling in the proportionate flow shop setting, Permutation flowshop manufacturing cell scheduling problems with deteriorating jobs and sequence dependent setup times under dominant machines, Three-machine flow shop scheduling with overlapping waiting time constraints, Unrelated parallel machines scheduling with deteriorating jobs and resource dependent processing times, Single machine common flow allowance scheduling with deteriorating jobs and a rate-modifying activity, A comparison of mixed-integer linear programming models for workforce scheduling with position-dependent processing times, Permutation flowshop scheduling with simple linear deterioration, A note on minimizing makespan in three machine flow shop with deteriorating jobs, Single machine past-sequence-dependent delivery times scheduling with general position-dependent and time-dependent learning effects, Two parallel-machine scheduling problems with function constraint, Approaches to Solving Scheduling with Due-Window Assignment and Deterioration Effects, Optimization of scheduling problems with deterioration effects and an optional maintenance activity, A maintenance activity scheduling with time-and-position dependent deteriorating effects, Single machine group scheduling with decreasing time-dependent processing times subject to release dates, Scheduling piecewise linear deteriorating jobs to minimize makespan in a two-machine flowshop, Single-machine ready times scheduling with group technology and proportional linear deterioration, Flow shop scheduling problem with position-dependent processing times, Triage Scheduling Optimization for Mass Casualty and Disaster Response, Scheduling with Deteriorating Jobs and Non-Simultaneous Machine Available Times, Minimizing Makespan in Permutation Flow Shop Scheduling with Proportional Deterioration, Scheduling jobs with position and sum-of-processing-time based processing times, ND-agent scheduling of linear-deteriorating tasks with positional due indices to minimize total completion time and maximum cost, Single machine SLK/DIF due window assignment problem with learning effect and deteriorating jobs, The single-machine total tardiness problem with unequal release times and a linear deterioration, Common Due Window Assignment Scheduling with Proportional Linear Deterioration Effects, A review of four decades of time-dependent scheduling: main results, new topics, and open problems, Permutation Flow Shop Problem with Shortening Job Processing Times, Improved algorithms for proportionate flow shop scheduling with due-window assignment, Single Machine Two-Agent Scheduling with Deteriorating Jobs, Single-machine scheduling problems with precedence constraints and simple linear deterioration, MAKESPAN MINIMIZATION ON THREE-MACHINE FLOW SHOP WITH DETERIORATING JOBS, A NOTE ON "SCHEDULING PROBLEMS WITH THE EFFECTS OF DETERIORATION AND LEARNING", Scheduling problems with effects of deterioration and truncated job-dependent learning