Single Machine Two-Agent Scheduling with Deteriorating Jobs
From MaRDI portal
Publication:5506754
DOI10.1142/S0217595916500342zbMath1354.90054MaRDI QIDQ5506754
Cai-Min Wei, Yu-Bin Wu, Zhenyou Wang
Publication date: 16 December 2016
Published in: Asia-Pacific Journal of Operational Research (Search for Journal in Brave)
Related Items
Two-agent scheduling on bounded parallel-batching machines with an aging effect of job-position-dependent ⋮ Optimization of scheduling problems with deterioration effects and an optional maintenance activity ⋮ Two-Machine and Two-Agent Flow Shop with Special Processing Times Structures ⋮ A just-in-time scheduling problem with two competing agents ⋮ ND-agent scheduling of linear-deteriorating tasks with positional due indices to minimize total completion time and maximum cost ⋮ Common Due Window Assignment Scheduling with Proportional Linear Deterioration Effects
Cites Work
- Minimizing makespan in three-machine flow shops with deteriorating jobs
- Single-machine scheduling with convex resource dependent processing times and deteriorating jobs
- Single-machine group scheduling with general deterioration and learning effects
- Scheduling problems with two agents and a linear non-increasing deterioration to minimize earliness penalties
- Parallel identical machines scheduling with deteriorating jobs and total absolute differences penalties
- Two-agent single-machine scheduling problems under increasing linear deterioration
- A single-machine scheduling problem with two-agent and deteriorating jobs
- Single machine group scheduling with time dependent processing times and ready times
- Time-dependent scheduling
- Scheduling time-dependent jobs under mixed deterioration
- A note to due-window assignment and single machine scheduling with deteriorating jobs and a rate-modifying activity
- Multi-agent scheduling on a single machine with max-form criteria
- Multi-agent single machine scheduling
- Pareto and scalar bicriterion optimization in scheduling deteriorating jobs
- Scheduling with Deteriorating Jobs and Non-Simultaneous Machine Available Times
- Minimizing Makespan in Permutation Flow Shop Scheduling with Proportional Deterioration
- Scheduling Two-Agents with a Time-Dependent Deterioration to Minimize the Minsum Earliness Measures
- Single-machine scheduling to minimize total absolute differences in waiting times with deteriorating jobs
- Single-Machine Scheduling with Learning Effect, Deteriorating Jobs and Convex Resource Dependent Processing Times
- Two-Agent Scheduling with Linear Deteriorating Jobs on a Single Machine
- Scheduling Problems with Two Competing Agents
- NP-hard cases in scheduling deteriorating jobs on dedicated machines
- Single machine total completion time minimization scheduling with a time-dependent learning effect and deteriorating jobs