Single machine two-agent scheduling with deteriorating jobs
From MaRDI portal
Publication:5506754
DOI10.1142/S0217595916500342zbMATH Open1354.90054MaRDI QIDQ5506754FDOQ5506754
Authors: Zhenyou Wang, Caimin Wei, Yu-Bin Wu
Publication date: 16 December 2016
Published in: Asia-Pacific Journal of Operational Research (Search for Journal in Brave)
Recommendations
- Two-Agent Scheduling with Linear Deteriorating Jobs on a Single Machine
- Two-agent scheduling with linear-deteriorating jobs and release dates on a single machine
- Two-agent single-machine scheduling problems under increasing linear deterioration
- A two-agent scheduling problem with deterioration
- A single-machine scheduling problem with two-agent and deteriorating jobs
Cites Work
- Multi-agent scheduling on a single machine with max-form criteria
- Multi-agent single machine scheduling
- Scheduling Problems with Two Competing Agents
- A single-machine scheduling problem with two-agent and deteriorating jobs
- Single-machine group scheduling with general deterioration and learning effects
- Single machine group scheduling with time dependent processing times and ready times
- Time-dependent scheduling
- NP-hard cases in scheduling deteriorating jobs on dedicated machines
- Scheduling time-dependent jobs under mixed deterioration
- Single machine total completion time minimization scheduling with a time-dependent learning effect and deteriorating jobs
- Minimizing makespan in permutation flow shop scheduling with proportional deterioration
- A note to due-window assignment and single machine scheduling with deteriorating jobs and a rate-modifying activity
- Single-machine scheduling with convex resource dependent processing times and deteriorating jobs
- Two-Agent Scheduling with Linear Deteriorating Jobs on a Single Machine
- Scheduling problems with two agents and a linear non-increasing deterioration to minimize earliness penalties
- Parallel identical machines scheduling with deteriorating jobs and total absolute differences penalties
- Two-agent single-machine scheduling problems under increasing linear deterioration
- Minimizing makespan in three-machine flow shops with deteriorating jobs
- Scheduling two-agents with a time-dependent deterioration to minimize the minsum earliness measures
- Pareto and scalar bicriterion optimization in scheduling deteriorating jobs
- Scheduling with deteriorating jobs and non-simultaneous machine available times
- Single-machine scheduling to minimize total absolute differences in waiting times with deteriorating jobs
- Single-machine scheduling with learning effect, deteriorating jobs and convex resource dependent processing times
Cited In (26)
- Two-agent scheduling on bounded parallel-batching machines with an aging effect of job-position-dependent
- Two-agent scheduling with deteriorating jobs on a single parallel-batching machine: refining computational complexity
- A just-in-time scheduling problem with two competing agents
- A single-machine scheduling problem with two-agent and deteriorating jobs
- Two-Agent Scheduling with Linear Deteriorating Jobs on a Single Machine
- A note on the scheduling with two families of jobs
- Two-agent scheduling of time-dependent jobs
- A multiple-criterion model for machine scheduling with constant deteriorating jobs
- Competitive two-agent scheduling with deteriorating jobs on a single parallel-batching machine
- Two-machine and two-agent flow shop with special processing times structures
- A two-agent scheduling problem with deterioration
- Two-agent scheduling with linear-deteriorating jobs and release dates on a single machine
- An optimal scheduling algorithm on single-machine with two-agent and deteriorating jobs
- Two-agent single-machine scheduling with cumulative deterioration
- Optimization of scheduling problems with deterioration effects and an optional maintenance activity
- A tabu method for a two-agent single-machine scheduling with deterioration jobs
- Scheduling linearly deteriorating jobs by two agents to minimize the weighted sum of two criteria
- Single machine scheduling problem with two synergetic agents and piece-rate maintenance
- A two-agent single-machine scheduling problem with learning and deteriorating considerations
- Two-agent scheduling with position-based deteriorating jobs and learning effects
- Two-agent single-machine scheduling problems under increasing linear deterioration
- ND-agent scheduling of linear-deteriorating tasks with positional due indices to minimize total completion time and maximum cost
- Two-agent scheduling with rejection on a single machine
- Scheduling two agents with sum-of-processing-times-based deterioration on a single machine
- Two-agent single-scheduling problems of proportionally-linear deteriorated jobs with the maxi-and-total cost criteria
- Common due window assignment scheduling with proportional linear deterioration effects
This page was built for publication: Single machine two-agent scheduling with deteriorating jobs
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5506754)