scientific article

From MaRDI portal
Publication:3425494

zbMath1106.90035MaRDI QIDQ3425494

Vincent T'kindt, Jean-Charles Billaut

Publication date: 23 February 2007


Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.



Related Items

Trade-off balancing in scheduling for flow shop production and perioperative processesReview and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspectiveTotal completion time minimization on multiple machines subject to machine availability and makespan constraintsThe third comprehensive survey on scheduling problems with setup times/costsA (0-1) goal programming model for scheduling the tour of a marketing executiveA multi-objective production scheduling case study solved by simulated annealingMinimizing total earliness and tardiness on a single machine using a hybrid heuristicAn \(O(n^{2})\) algorithm for the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machinesA review and classification on distributed permutation flowshop scheduling problemsIntelligent optimization under the makespan constraint: rapid evaluation mechanisms based on the critical machine for the distributed flowshop group scheduling problemBicriteria scheduling concerned with makespan and total completion time subject to machine availability constraintsAn improved lower bound for a bi-criteria scheduling problemPareto optima for total weighted completion time and maximum lateness on a single machineUsing the gravitational emulation local search algorithm to solve the multi-objective flexible dynamic job shop scheduling problem in small and medium enterprisesHeuristic for a new multiobjective scheduling problemTwo-machine open shop problem with controllable processing timesBicriterion scheduling with equal processing times on a batch processing machineA survey of scheduling problems with no-wait in processOn dominance-based multiobjective local search: design, implementation and experimental analysis on scheduling and traveling salesman problemsA common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: multi-agent scheduling problemsA bi-objective coordination setup problem in a two-stage production systemA bicriterion approach to time/cost trade-offs in scheduling with convex resource-dependent job processing times and release datesBest compromise solution for a new multiobjective scheduling problemNo-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespanBicriteria hierarchical optimization of two-machine flow shop scheduling problem with time-dependent deteriorating jobsA novel differential evolution algorithm for bi-criteria no-wait flow shop scheduling problemsParallel machine makespan minimization subject to machine availability and total completion time constraintsPareto and scalar bicriterion optimization in scheduling deteriorating jobsAn ant colony optimization algorithm to solve a 2-machine bicriteria flowshop scheduling problemOn the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machines