Scheduling continuous aluminium casting lines
From MaRDI portal
Publication:3541174
DOI10.1080/00207540701355212zbMath1157.90413OpenAlexW2126698800MaRDI QIDQ3541174
Ekrem Duman, Ali Fuat Alkaya, Mehmet Bayram Yildirim
Publication date: 25 November 2008
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: http://hdl.handle.net/10057/3438
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Traffic problems in operations research (90B20)
Related Items (1)
Cites Work
- Real-time vehicle routing: Solution concepts, algorithms and parallel computing strategies.
- A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron \& Steel Complex
- The hot strip mill production scheduling problem: A tabu search approach
- Scheduling continuous casting of aluminum using a multiple objective ant colony optimization metaheuristic
- A Dynamic Programming Solution to the Dynamic, Multi-Item, Single-Machine Scheduling Problem
- Steel production schedule generation
- Heuristic scheduling of parallel machines with sequence-dependent set-up times
- Steel-making process scheduling using Lagrangian relaxation
- Exact algorithms for scheduling multiple families of jobs on parallel machines
- A review of planning and scheduling systems and methods for integrated steel production
This page was built for publication: Scheduling continuous aluminium casting lines