Parallel machine scheduling problems with proportionally deteriorating jobs
From MaRDI portal
Publication:3612784
Recommendations
Cites work
- A concise survey of scheduling with time-dependent processing times
- A polynomial-time approximation scheme for maximizing the minimum machine completion time
- Bounds on Multiprocessing Timing Anomalies
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Parallel machine scheduling with time dependent processing times
- Scheduling Deteriorating Jobs on a Single Processor
- Scheduling to Maximize the Minimum Processor Finish Time in a Multiprocessor System
- The exact LPT-bound for maximizing the minimum completion time
Cited in
(27)- Parallel Processing and Applied Mathematics
- Unrelated parallel-machine scheduling with position-dependent deteriorating jobs and resource-dependent processing time
- A new model and algorithm for uncertain random parallel machine scheduling problem
- Minimising makespan for two batch-processing machines with non-identical job sizes in job shop
- A note on parallel-machine scheduling with deteriorating jobs
- Dynamic performance and cost measures with setup determination under state-age-dependent deterioration
- Scheduling piecewise linear deteriorating jobs to minimize makespan in a two-machine flowshop
- Parallel-Machine Scheduling with Step-Deteriorating Jobs to Minimize the Total (Weighted) Completion Time
- Parallel Processing and Applied Mathematics
- Parallel machine scheduling with completion-time-based criteria and sequence-dependent deterioration
- Permutation flowshop scheduling with simple linear deterioration
- Scheduling on parallel machines to minimise maximum lateness for the customer order problem
- Single-machine scheduling with past-sequence-dependent setup times and learning effects: a parametric analysis
- Scheduling in a multi-processor environment with deteriorating job processing times and decreasing values: the case of forest fires
- A Production Plan Considering Parallel Machines and Deteriorating Effects: Minimizing the Makespan in the Section of Steel Box Girder Processing
- Modeling the parallel machine scheduling problem with step deteriorating jobs
- Single machine total completion time minimization scheduling with a time-dependent learning effect and deteriorating jobs
- Complexity of scheduling with proportional deterioration and release dates
- Parallel identical machines scheduling with deteriorating jobs and total absolute differences penalties
- Parallel-machine scheduling of simple linear deteriorating jobs
- A review of four decades of time-dependent scheduling: main results, new topics, and open problems
- One-machine scheduling problems with deteriorating jobs and position-dependent learning effects under group technology considerations
- scientific article; zbMATH DE number 7339458 (Why is no real title available?)
- Performance analysis of rotation schedule and improved strategy for open shop problem to minimise makespan
- Parallel machines scheduling to minimize job tardiness and machine deteriorating cost with deteriorating jobs
- Heuristics for parallel machine scheduling with deterioration effect
- Scheduling proportionally deteriorating jobs in two-machine open shop with a non-bottleneck machine
This page was built for publication: Parallel machine scheduling problems with proportionally deteriorating jobs
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3612784)