Efficient Algorithms for Scheduling Semiconductor Burn-In Operations
DOI10.1287/OPRE.40.4.764zbMATH Open0759.90046OpenAlexW2111001493MaRDI QIDQ4022933FDOQ4022933
Authors: Chung-Yee Lee, Reha Uzsoy, Louis A. Martin-Vega
Publication date: 17 January 1993
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.40.4.764
Recommendations
- Scheduling Semiconductor Burn-In Operations to Minimize Total Flowtime
- Minimizing makespan on a single burn-in oven in semiconductor manufacturing
- Minimizing makespan on a single burn-in oven with job families and dynamic job arrivals
- Scheduling a burn-in oven with non-agreeable release times and due dates
- Scheduling with agreeable release times and due dates on a batch processing machine
heuristicsbatch processing machinesworst case error boundsparallel identical batch processingscheduling semiconductor burn-in operations
Applications of mathematical programming (90C90) Deterministic scheduling theory in operations research (90B35) Dynamic programming (90C39) Production models (90B30)
Cited In (only showing first 100 items - show all)
- Minimizing total weighted tardiness on a single batch process machine with incompatible job families
- Scheduling algorithm for flow shop with two batch-processing machines and arbitrary job sizes
- Semiconductor final-test scheduling under setup operator constraints
- Single machine batch scheduling with release times
- Parallel-machine parallel-batching scheduling with family jobs and release dates to minimize makespan
- Online unbounded batch scheduling on parallel machines with delivery times
- Scheduling a single batch processing machine with non-identical job sizes
- Scheduling batch processing machines with incompatible job families
- Best semi-online algorithms for unbounded parallel batch scheduling
- Online parallel-batch scheduling to minimize total weighted completion time on single unbounded machine
- The unbounded parallel batch machine scheduling with release dates and rejection to minimize makespan
- Optimal on-line algorithms for one batch machine with grouped processing times
- A HYBRID TWO-STAGE FLOWSHOP SCHEDULING PROBLEM
- Solving single batch-processing machine problems using an iterated heuristic
- Online over time scheduling on parallel-batch machines: a survey
- THE NP-HARDNESS OF MINIMIZING THE TOTAL LATE WORK ON AN UNBOUNDED BATCH MACHINE
- A meta-heuristic to minimize makespan for parallel batch machines with arbitrary job sizes
- Scheduling parallel batch processing machines with arbitrary job sizes and incompatible job families
- The coordination of scheduling and batch deliveries
- Scheduling one batch processor subject to job release dates
- An improved on-line algorithm for scheduling on two unrestrictive parallel batch processing machines
- Effective hybrid genetic algorithm for minimizing makespan on a single-batch-processing machine with non-identical job sizes
- On-line scheduling on an unbounded parallel batch machine to minimize makespan of two families of jobs
- The unbounded single machine parallel batch scheduling problem with family jobs and release dates to minimize makespan
- Scheduling with batching: A review
- On scheduling an unbounded batch machine
- Batching decisions for assembly production systems
- Minimizing number of tardy jobs on a batch processing machine with incompatible job families
- Scheduling a batch-processing machine subject to precedence constraints, release dates and identical processing times
- Single machine unbounded parallel-batch scheduling with forbidden intervals
- Minimizing the makespan on a batch machine with non-identical job sizes: An exact procedure
- Integrated production and delivery on parallel batching machines
- Batch sequencing and cooperation
- A hybrid genetic heuristic for scheduling parallel batch processing machines with arbitrary job sizes
- An improved on-line algorithm for single parallel-batch machine scheduling with delivery times
- The lockmaster's problem
- Single machine batch scheduling with two non-disjoint agents and splitable jobs
- A flexible on-line scheduling algorithm for batch machine with infinite capacity
- On-line scheduling algorithms for a batch machine with finite capacity
- An on-line algorithm for the single machine unbounded parallel-batching scheduling with large delivery times
- A best on-line algorithm for the single machine parallel-batch scheduling with restricted delivery times
- Parallel batch scheduling of equal-length jobs with release and due dates
- A genetic algorithm for minimizing maximum lateness on parallel identical batch processing machines with dynamic job arrivals and incompatible job families
- Scheduling unrelated parallel batch processing machines with non-identical job sizes
- Minimizing makespan on a single burn-in oven in semiconductor manufacturing
- Single machine parallel-batch scheduling with deteriorating jobs
- On-line scheduling with delivery time on a single batch machine
- Makespan minimization on single batch-processing machine via ant colony optimization
- Scheduling algorithms for a semiconductor probing facility
- Scheduling parallel-machine batch operations to maximize on-time delivery performance
- Split-merge: using exponential neighborhood search for scheduling a batching machine
- MINIMIZING TOTAL WEIGHTED COMPLETION TIME ON IDENTICAL PARALLEL BATCH MACHINES
- Bi-criteria scheduling on a single parallel-batch machine
- Controlling delivery performance in semiconductor manufacturing using Look Ahead Batching
- Dynamic scheduling of batch-processing machines with non-identical product sizes
- A best possible deterministic on-line algorithm for minimizing makespan on parallel batch machines
- Bounded parallel-batching scheduling with two competing agents
- Unbounded parallel-batching scheduling with two competitive agents
- Parallel machines scheduling to minimize job tardiness and machine deteriorating cost with deteriorating jobs
- Scheduling a bounded parallel-batching machine with incompatible job families and rejection
- Semiconductor manufacturing scheduling of jobs containing multiple orders on identical parallel machines
- A note on unbounded parallel-batch scheduling
- Two-agent scheduling on a single parallel-batching machine with equal processing time and non-identical job sizes
- Online batch scheduling on parallel machines with delivery times
- Approximation schemes for minimizing total (weighted) completion time with release dates on a batch machine
- Bicriterion scheduling with equal processing times on a batch processing machine
- Bounded parallel-batch scheduling on single and multi machines for deteriorating jobs
- Unbounded parallel batch scheduling with job delivery to minimize makespan
- Scheduling jobs with release dates on parallel batch processing machines to minimize the makespan
- On the approximate tradeoff for bicriteria batching and parallel machine scheduling problems.
- Minimizing earliness-tardiness on a single burn-in oven with a common due date and maximum allowable tardiness constraint
- Minimizing makespan on a single batching machine with release times and non-identical job sizes
- Online scheduling on batching machines to minimise the total weighted completion time of jobs with precedence constraints and identical processing times
- Scheduling with agreeable release times and due dates on a batch processing machine
- Controlling job arrivals with processing time windows into batch processor buffer
- Tabu search methods for scheduling a burn-in oven with non-identical job sizes and secondary resource constraints
- A coordination mechanism for a scheduling game with parallel-batching machines
- Minimizing makespan on a single batch processing machine with nonidentical job sizes
- Minimizing makespan with release times on identical parallel batching machines
- Minimizing total completion time on a batch processing machine with job families
- Realistic two-stage flowshop batch scheduling problems with transportation capacity and times
- Minimising makespan on parallel batch processing machines with non-identical ready time and arbitrary job sizes
- Coordinated multistage scheduling of parallel batch-processing machines under multiresource constraints
- Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint
- A new dynamic look-ahead scheduling procedure for batching machines
- Minimizing makespan in a two-machine flowshop with dynamic arrivals allowed
- Heuristics and lower bound for minimizing maximum lateness on a batch processing machine with incompatible job families
- Learning effective dispatching rules for batch processor scheduling
- Two-agent bounded parallel-batching scheduling for minimizing maximum cost and makespan
- A multi-objective differential evolution algorithm for parallel batch processing machine scheduling considering electricity consumption cost
- Optimal online-list batch scheduling
- A note on two-agent scheduling on an unbounded parallel-batching machine with makespan and maximum lateness objectives
- Online batch scheduling with kind release times and incompatible families to minimize makespan
- Scheduling a proportionate flow shop of batching machines
- Integrated production and transportation on parallel batch machines to minimize total weighted delivery time
- A truncated column generation algorithm for the parallel batch scheduling problem to minimize total flow time
- Scheduling and common due date assignment on a single parallel-batching machine with batch delivery
- Minimizing makespan on a single burn-in oven with job families and dynamic job arrivals
- An online scheduling problem on a drop-line parallel batch machine with delivery times and limited restart
- A coordination mechanism for a scheduling game with uniform-batching machines
This page was built for publication: Efficient Algorithms for Scheduling Semiconductor Burn-In Operations
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4022933)