Solving the Project Time/Cost Tradeoff Problem Using the Minimal Cut Concept
From MaRDI portal
Publication:4147802
DOI10.1287/mnsc.24.4.393zbMath0371.90039OpenAlexW2041242446MaRDI QIDQ4147802
Mohamed I. Dessouky, Steve Jun. Phillips
Publication date: 1977
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.24.4.393
Programming involving graphs or networks (90C35) Applications of mathematical programming (90C90) Deterministic network models in operations research (90B10)
Related Items
The contractor time–cost–credit trade‐off problem: integer programming model, heuristic solution, and business insights, Time-cost trade-off analysis of project networks in fuzzy environments, Modeling stochastic project time-cost trade-offs with time-dependent activity durations, Finding an optimal Nash equilibrium to the multi-agent project scheduling problem, Minimizing task completion time with the execution set method, A heuristic procedure for solving the dynamic probabilistic project expediting problem, Unnamed Item, New fuzzy models for time-cost trade-off problem, On project scheduling with irregular starting time costs, Nash equilibria for the multi-agent project scheduling problem with controllable processing times, A new approach based on the surrogating method in the project time compression problems, Nash equilibrium solutions in multi-agent project scheduling with milestones, Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem, Price of anarchy and price of stability in multi-agent project scheduling, Resource-constrained project scheduling: Notation, classification, models, and methods, Minimization of the makespan in a two-machine problem under given resource constraints, A parametric algorithm for convex cost network flow and related problems, Improving project cost estimation by taking into account managerial flexibility