Solving the Project Time/Cost Tradeoff Problem Using the Minimal Cut Concept
From MaRDI portal
Publication:4147802
DOI10.1287/MNSC.24.4.393zbMATH Open0371.90039OpenAlexW2041242446MaRDI QIDQ4147802FDOQ4147802
Mohamed I. Dessouky, Steve Jun. Phillips
Publication date: 1977
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.24.4.393
Programming involving graphs or networks (90C35) Applications of mathematical programming (90C90) Deterministic network models in operations research (90B10)
Cited In (18)
- Time-cost trade-off analysis of project networks in fuzzy environments
- Optimization models and a GA-based algorithm for stochastic time-cost trade-off problem
- On project scheduling with irregular starting time costs
- Finding an optimal Nash equilibrium to the multi-agent project scheduling problem
- Minimizing task completion time with the execution set method
- Modeling stochastic project time-cost trade-offs with time-dependent activity durations
- Nash equilibria for the multi-agent project scheduling problem with controllable processing times
- Nash equilibrium solutions in multi-agent project scheduling with milestones
- Price of anarchy and price of stability in multi-agent project scheduling
- Minimization of the makespan in a two-machine problem under given resource constraints
- Resource-constrained project scheduling: Notation, classification, models, and methods
- A new approach based on the surrogating method in the project time compression problems
- The contractor time–cost–credit trade‐off problem: integer programming model, heuristic solution, and business insights
- A parametric algorithm for convex cost network flow and related problems
- New fuzzy models for time-cost trade-off problem
- Improving project cost estimation by taking into account managerial flexibility
- A heuristic procedure for solving the dynamic probabilistic project expediting problem
- Title not available (Why is that?)
This page was built for publication: Solving the Project Time/Cost Tradeoff Problem Using the Minimal Cut Concept
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4147802)