A hybrid GA/heuristic approach to the simultaneous scheduling of machines and automated guided vehicles
From MaRDI portal
Publication:4474717
DOI10.1080/0020754032000123579zbMath1052.90548OpenAlexW2064563962MaRDI QIDQ4474717
Tamer F. Abdelmaguid, Ashraf O. Nassef, Badawia A. Kamal, Mohamed Fahim Hassan
Publication date: 12 July 2004
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/0020754032000123579
Related Items (10)
Scheduling of machines and automated guided vehicles in FMS using differential evolution ⋮ Integrating employee timetabling with scheduling of machines and transporters in a job-shop environment: a mathematical formulation and an anarchic society optimization algorithm ⋮ A hybrid particle swarm optimization and simulated annealing algorithm for the job shop scheduling problem with transport resources ⋮ A Multi-Fidelity Model Approach for Simultaneous Scheduling of Machines and Vehicles in Flexible Manufacturing Systems ⋮ A simple metaheuristic approach to the simultaneous scheduling of machines and automated guided vehicles ⋮ Transfer batch scheduling using genetic algorithms ⋮ Integrated scheduling of handling equipment at automated container terminals ⋮ A genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constraints and bounded processing times ⋮ Joint production and transportation scheduling in flexible manufacturing systems ⋮ An MILP for scheduling problems in an FMS with one vehicle
Cites Work
- A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles
- Complexity of Scheduling under Precedence Constraints
- Job shop scheduling considering material handling
- A Time Window Approach to Simultaneous Scheduling of Machines and Material Handling System in an FMS
This page was built for publication: A hybrid GA/heuristic approach to the simultaneous scheduling of machines and automated guided vehicles