A Time Window Approach to Simultaneous Scheduling of Machines and Material Handling System in an FMS
From MaRDI portal
Publication:4887728
DOI10.1287/opre.43.6.1058zbMath0852.90083OpenAlexW2018545447MaRDI QIDQ4887728
Publication date: 9 December 1996
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.43.6.1058
interactionsmachine schedulingheuristicflexible manufacturing systemscheduling of the material handling systemvehicle scheduling subproblem
Applications of mathematical programming (90C90) Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Production models (90B30)
Related Items (24)
Scheduling of machines and automated guided vehicles in FMS using differential evolution ⋮ Performance evaluation of dynamic scheduling approaches in vehicle-based internal transport systems ⋮ A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots ⋮ Integrating employee timetabling with scheduling of machines and transporters in a job-shop environment: a mathematical formulation and an anarchic society optimization algorithm ⋮ A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles ⋮ A bilevel decomposition algorithm for simultaneous production scheduling and conflict-free routing for automated guided vehicles ⋮ A multistart biased random key genetic algorithm for the flexible job shop scheduling problem with transportation ⋮ Flexible job-shop scheduling with transportation resources ⋮ A hybrid particle swarm optimization and simulated annealing algorithm for the job shop scheduling problem with transport resources ⋮ A Multi-Fidelity Model Approach for Simultaneous Scheduling of Machines and Vehicles in Flexible Manufacturing Systems ⋮ Integrated production and material handling scheduling using mathematical programming and constraint programming ⋮ A simple metaheuristic approach to the simultaneous scheduling of machines and automated guided vehicles ⋮ Integrated scheduling of handling equipment at automated container terminals ⋮ Machine scheduling with transportation considerations ⋮ A genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constraints and bounded processing times ⋮ Tabu search algorithms for job-shop problems with a single transport robot ⋮ Joint production and transportation scheduling in flexible manufacturing systems ⋮ Simultaneous job input sequencing and vehicle dispatching in a single-vehicle automated guided vehicle system: a heuristic branch-and-bound approach coupled with a discrete events simulation model ⋮ The blocking job shop with rail-bound transportation ⋮ A hybrid GA/heuristic approach to the simultaneous scheduling of machines and automated guided vehicles ⋮ An MILP for scheduling problems in an FMS with one vehicle ⋮ Survey of research in the design and control of automated guided vehicle systems ⋮ A review of design and control of automated guided vehicle systems ⋮ A multiple-crane-constrained scheduling problem in a container terminal
This page was built for publication: A Time Window Approach to Simultaneous Scheduling of Machines and Material Handling System in an FMS